The set of products for modernisation of the T-100/120-130-2 turbine includes delivery of a new CVD with a one-stage regulating stage and nine pressure stages, as well as a number of other assemblies and parts, including a modernised camshaft distributor with a reinforced frame, modernised regulating and stop valves, thrust bearing with modernised thrust pads of increased bearing capacity, a new electrohydraulic regulation and protection system, etc.
The turbine modernisation provides:
- improvement of steam distribution operation;
- increased turbine efficiency due to optimisation of the flow section.
Tell us what you need and get quotes from verified suppliers