Products — Power Supply & Distribution

Power Supply Unit "MIRAN BP2425

Power Supply Unit "MIRAN BP2425

$150-480
MARINEK LLC 🇷🇺
On-Board Power Supply Unit DIPP-01KM IDBM.435251.008-02

On-Board Power Supply Unit DIPP-01KM IDBM.435251.008-02

$900-3,000
EMZ AVANGARD-KONVERSIYA OJSC 🇷🇺
DC Voltage Source B5-90 for Stable Power Supply

DC Voltage Source B5-90 for Stable Power Supply

$210-600
RIP-Impuls LLC 🇷🇺
Power Supply Unit for Server Systems TGVB.436238.003 - 800W

Power Supply Unit for Server Systems TGVB.436238.003 - 800W

$150-480
ELEMENT-TECHNOLOGIES LLC 🇷🇺
Intrinsically Safe Communication Power Supply SHIP-K

Intrinsically Safe Communication Power Supply SHIP-K

$900-3,600
INGORTECH LLC 🇷🇺
Industrial Power Supply AC-LVMP 350W 3U/2M

Industrial Power Supply AC-LVMP 350W 3U/2M

$420-1,800
PARAMERUS LLC 🇷🇺
Low Voltage Power Supply PS2-DSV3 for Security Systems

Low Voltage Power Supply PS2-DSV3 for Security Systems

$9-30
ELTIS TRADING LLC 🇷🇺
12V Power Supply Unit PS-1512

12V Power Supply Unit PS-1512

$9-30
NIL AP LLC 🇷🇺
Input Module TKN01.000.000.00 - Power Converter

Input Module TKN01.000.000.00 - Power Converter

$1,500-6,000
TRANS CONVERTER LLC 🇷🇺
DC Power Supply Device for Special Equipment 15L748

DC Power Supply Device for Special Equipment 15L748

$900-3,600
Research Institute of Chemical Technology OJSC 🇷🇺
Power Source Backup Module MRIP-01D

Power Source Backup Module MRIP-01D

$18-60
RISPA LLC 🇷🇺
Chemical Current Source SDS-4 for Radio Equipment

Chemical Current Source SDS-4 for Radio Equipment

$3-18
Research Institute of Chemical Technology OJSC 🇷🇺
Power Supply and Communication Unit BPS-21M3 IBYAL.411111.047

Power Supply and Communication Unit BPS-21M3 IBYAL.411111.047

$90-300
Federal State Unitary Enterprise "Scientific Production Association "Analitpribor" 🇷🇺
Combined Power Supply BPK-5M-T

Combined Power Supply BPK-5M-T

$150-540
LLC "NTs "MEHANOTRONIKA" 🇷🇺
Power Supply Module EF A 1AC/48DC-10

Power Supply Module EF A 1AC/48DC-10

$90-300
Elesi PSA Plant LLC 🇷🇺
Voltage Normalizer ESSV-I 3.200-130-02

Voltage Normalizer ESSV-I 3.200-130-02

$3,000-9,600
LAGUNA TK LLC 🇷🇺
Power Supply Systems ESPT-48-Ex-2U-9kW

Power Supply Systems ESPT-48-Ex-2U-9kW

$4,800-15,000
ENERGOMERA OJSC 🇷🇺
Weatherproof Power Supply Germikom M1000

Weatherproof Power Supply Germikom M1000

$15-48
KOMKOM LLC 🇷🇺
Power Supply BNN-32P for Detection Devices

Power Supply BNN-32P for Detection Devices

$360-1,800
SNIIIP OJSC 🇷🇺
Relay-Regulator R10TKM-1C.000 for Electrical Equipment

Relay-Regulator R10TKM-1C.000 for Electrical Equipment

$90-360
ELECTROMASHINA OJSC 🇷🇺
Stabilized DC Power Supply BП-РВ-380/660

Stabilized DC Power Supply BП-РВ-380/660

$900-3,000
INTELMAINE LLC 🇷🇺
Unified Hydraulic Cylinder for Pumping Stations

Unified Hydraulic Cylinder for Pumping Stations

$1,800-18,000
SIBENERGOMASH - BKZ LLC 🇷🇺
Stabilized Power Supply Source AT Series

Stabilized Power Supply Source AT Series

$3-30
AKOM LLC 🇷🇺
Stabilizing Power Module SMV200E

Stabilizing Power Module SMV200E

$18-60
MMP-IRBIS LLC 🇷🇺
Power Supply Module MPV-DC-30 for VMEbus and Compact PCI

Power Supply Module MPV-DC-30 for VMEbus and Compact PCI

$150-600
KOMPONENT-ASU OJSC 🇷🇺
Addressable DC Power Supply Unit AKOR-BPRA

Addressable DC Power Supply Unit AKOR-BPRA

$90-300
RUSSBYT LLC 🇷🇺

Transformers, UPS and Power Supplies for Grid and Facility Projects

From a wall-mounted power module to a packaged substation, this 3,015-listing category from 532 suppliers covers the full power conversion chain. The depth is in the mid-range: 474 power supplies and modules, 306 starter batteries, 303 inverters, rectifiers and chargers, 269 stationary and lithium-ion batteries, 249 power transformers, 230 uninterruptible power supplies, 171 instrument current transformers and 85 voltage transformers, 119 special and choke transformers, 109 switchgear positions, 74 packaged substations, plus measurement transducers and voltage stabilizers.

Transformer building is a long-standing Russian export strength — machines for utilities across Asia, Africa and Latin America have come from these plants for decades, and service infrastructure for them already exists in many importing countries. The battery and UPS segment grew more recently on telecom and data-centre demand. Across the category, equipment is engineered for wide temperature ranges and tolerant of grid disturbance, with routine factory testing documented per unit.

  • Utility equipment: distribution transformers and packaged substations configured to your network voltages and vector groups.
  • Factory tests: routine test protocols per transformer and UPS; witnessed acceptance available for utility orders.
  • Battery logistics: lithium systems ship under dangerous-goods rules; suppliers prepare UN-compliant packaging and documents.
  • Order scale: single units for facilities; framework contracts for utility tender volumes.
  • Delivery: FOB Novorossiysk or St. Petersburg; rail and truck across the EAEU and Central Asia.

State your network parameters and load profile in a sourcing request and manufacturers will configure and quote the equipment.

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.