Products — Power Supply & Distribution

Power Supply Module ZPU-10P-110

Power Supply Module ZPU-10P-110

$150-480
EKRA LLC 🇷🇺
Adjustable High Voltage Power Supply HVHP

Adjustable High Voltage Power Supply HVHP

$150-600
PARAMERUS LLC 🇷🇺
Voltage Stabilization Device - USN.CES

Voltage Stabilization Device - USN.CES

$1,500-9,000
CENTRENERGOSOYUZ LLC 🇷🇺
Autonomous Battery Charger and Starter ZU-3P

Autonomous Battery Charger and Starter ZU-3P

$420-1,500
COMETA-S LLC 🇷🇺
Single-Phase Voltage Stabilizer for Power Supply - LAUREL

Single-Phase Voltage Stabilizer for Power Supply - LAUREL

$900-3,600
MICROPROCESSOR TECHNOLOGIES LLC 🇷🇺
12V DC Power Supply Unit BП-12/2A

12V DC Power Supply Unit BП-12/2A

$90-300
ARGUS-SPEKTR LLC 🇷🇺
Power Supply Unit (UP-1) VITYA 408124 004

Power Supply Unit (UP-1) VITYA 408124 004

$30-180
SATURN-PC LLC 🇷🇺
Battery Switching Module KAM200-04

Battery Switching Module KAM200-04

$90-300
AXITECH LLC 🇷🇺
Combined Power Supply BPK-5-T

Combined Power Supply BPK-5-T

$90-360
LLC "NTs "MEHANOTRONIKA" 🇷🇺
Backup Power Supply SKAT-1200R20

Backup Power Supply SKAT-1200R20

$90-300
BASTION CJSC 🇷🇺
Voltage Converter Module KPMC112 with CompactFlash Slot

Voltage Converter Module KPMC112 with CompactFlash Slot

$30-180
OJSC "NPO Aurora" 🇷🇺
EF Power Supply Module 1AC/48DC-1 for Industrial Automation

EF Power Supply Module 1AC/48DC-1 for Industrial Automation

$21-84
Elesi PSA Plant LLC 🇷🇺
Backup Current Source SDS-3M for Portable Radio Equipment

Backup Current Source SDS-3M for Portable Radio Equipment

$3-18
Research Institute of Chemical Technology OJSC 🇷🇺
Power Supply Source VIP-4000/220 AC

Power Supply Source VIP-4000/220 AC

$900-3,000
NVP OJSC 🇷🇺
Liquid Level Control Device Power Supply (UKU-1)

Liquid Level Control Device Power Supply (UKU-1)

$9-36
CJSC "PO "SPETSAVTOMATIKA" 🇷🇺
Combined Power Supply BPK-5

Combined Power Supply BPK-5

$90-360
LLC "NTs "MEHANOTRONIKA" 🇷🇺
KSA-02 Controller for Signal Processing Module CT1CPS220

KSA-02 Controller for Signal Processing Module CT1CPS220

$90-300
SYSTEMOTECHNICS-NN LLC 🇷🇺
EF Power Supply Module 1AC/24DC-8 for Industrial Automation

EF Power Supply Module 1AC/24DC-8 for Industrial Automation

$90-300
Elesi PSA Plant LLC 🇷🇺
Impulse Junior MP 850 Uninterruptible Power Supply

Impulse Junior MP 850 Uninterruptible Power Supply

$42-120
SYSTEMOTECHNICS LLC 🇷🇺
Power Supply Unit for Devices, Model PS-1536

Power Supply Unit for Devices, Model PS-1536

$9-30
NIL AP LLC 🇷🇺
DC Power Supply Module MP-8012 AXIe-0

DC Power Supply Module MP-8012 AXIe-0

$900-3,000
VXI-SYSTEMS LLC 🇷🇺
ZPU-10-4 Module Connection Cassette

ZPU-10-4 Module Connection Cassette

$150-540
EKRA LLC 🇷🇺
DC Power Module MP150V3A

DC Power Module MP150V3A

$150-480
VXI-SYSTEMS LLC 🇷🇺

Transformers, UPS and Power Supplies for Grid and Facility Projects

From a wall-mounted power module to a packaged substation, this 3,015-listing category from 532 suppliers covers the full power conversion chain. The depth is in the mid-range: 474 power supplies and modules, 306 starter batteries, 303 inverters, rectifiers and chargers, 269 stationary and lithium-ion batteries, 249 power transformers, 230 uninterruptible power supplies, 171 instrument current transformers and 85 voltage transformers, 119 special and choke transformers, 109 switchgear positions, 74 packaged substations, plus measurement transducers and voltage stabilizers.

Transformer building is a long-standing Russian export strength — machines for utilities across Asia, Africa and Latin America have come from these plants for decades, and service infrastructure for them already exists in many importing countries. The battery and UPS segment grew more recently on telecom and data-centre demand. Across the category, equipment is engineered for wide temperature ranges and tolerant of grid disturbance, with routine factory testing documented per unit.

  • Utility equipment: distribution transformers and packaged substations configured to your network voltages and vector groups.
  • Factory tests: routine test protocols per transformer and UPS; witnessed acceptance available for utility orders.
  • Battery logistics: lithium systems ship under dangerous-goods rules; suppliers prepare UN-compliant packaging and documents.
  • Order scale: single units for facilities; framework contracts for utility tender volumes.
  • Delivery: FOB Novorossiysk or St. Petersburg; rail and truck across the EAEU and Central Asia.

State your network parameters and load profile in a sourcing request and manufacturers will configure and quote the equipment.

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.