The machine is designed to perform a range of works during construction of new and repair and reconstruction of old railway lines:
- complex primary alignment of the railway track in three coordinates and its lifting (functions of the electric ballast machine),
- volumetric compaction of the ballast prism (functions of the dressing and finishing machine),
- planning and redistribution of freshly dumped or cleaned, non-frizzled ballast, and ballast prism finishing (functions of ballast planner distributor),
- regulated and controlled stabilisation of the railway track (functions of a dynamic track stabiliser),
- localised track alignment in confined spaces (functions of a shoring block).
-Track lifting and straightening in the range of ±300 mm.
-Effective compaction of the ballast prism by means of vibratory plates at a speed of up to 3000 sleepers per hour.
-Combination in one machine of a complete set of working bodies and coverage of the full range of works, providing the possibility of opening the movement of ....
Tell us what you need and get quotes from verified suppliers