The installation is designed to study the device, the principle of operation and the main characteristics of the rod deep well pump. The list of works performed on the training stand:- Designation, principle of operation and study of the design of the main units of the borehole pump.- Determination of the delivery coefficient of the rod deep well pump in the absence of gas impurities.- The influence of dissolved gas on the delivery coefficient of the rod pump.- Determination of the magnitude of elastic deformations from the pumping parameters
Tell us what you need and get quotes from verified suppliers