Kombine tunnelling KP150 is designed for mechanisation of stripping and loading of rock mass when carrying out horizontal and inclined from minus 18 to plus 18 mine workings of arched, trapezoidal and rectangular cross-sectional shapes, with the area from 10 to 35 m. The executive body of the combine with telescopically extending boom and 150 kW engine provides effective work in faces with increased strength.The irrigation system provides effective dust suppression and prevents friction sparking.The loading unit provides effective loading of broken rock mass.The undercarriage provides increased stability and reduced specific pressure on the ground due to the increased width of the track. The system of remote control of the combine harvester provides: control from a portable console via radio channel; objective control over the work of the combine harvester systems; registration and storage of information and transfer of information to an external device and to the dispatcher's console.
Tell us what you need and get quotes from verified suppliers