BU of two-echelon design for single and cluster drilling of production oil, gas, gas condensate wells, high assembly capacity and mobility. Hook load 320 tonnes for medium deep wells. Vertical lifting derrick. Cylinder lifting system.
Permissible hook load of at least 3200 kN. Conditional drilling depth of 5000 metres. Estimated service life not less than 25 years. Provision of the drilling rig movement within the cluster from 5 to 45 metres at a speed of not less than 5 m/hour.
Permissible wind load during operation - 20.5 m/s. The temperature of the area of works-45C - +40C.
Tell us what you need and get quotes from verified suppliers