Designed for transportation of dry powdery materials (cement, plugging mixtures, etc.), preparation of plugging solutions, their accumulation and mixing, injection of various liquids in the process of well cementing and other flushing and pumping operations in wells.During well workover it can replace: cementing unit and mixing unit; it can work both independently and in complex with other units; it can deliver up to 5 tonnes of cement to the well, prepare cement slurry with required density and inject it into the well; the unit has an upgraded pump with improved operational characteristics and increased maintainability; ODN pump is used for water supply to the measuring tank, mixing tank, as well as for flushing of these tanks and the entire manifold;
Tell us what you need and get quotes from verified suppliers