The complex consists of nine towers. On the 1st tower handles, crossbars, boom beam are installed. On the 2nd tower handles, crossbars are installed. The 3rd tower has handles, crossbars.
The 4th tower has handles, crossbars. The 5th tower has handles and crossbars. The 6th tower has handles, bars and a gymnastic bench. The 7th tower has handles, crossbars, pole, buffet walls.
The 8th tower has handles, crossbars, a climbing wall, a rope bar, and Swedish walls. The 9th tower has handles, bars, a climbing wall, a rope bar, a rope crossbar, Swedish walls and a liana. The first and second towers are connected by a suspension beam with a safety bridge, the second and third towers are connected by a complex of step stools, the third and fourth towers are connected by a suspension bridge, the fourth and fifth towers are connected by a suspension beam with a safety bridge, the fifth and sixth towers are connected by a vertical metal net and a handrail, the sixth and seventh towers are connected by crossbars, the seventh and eighth towers are connected by a plastic curved passage, the eighth and ninth towers are connected by a handrail.
Tell us what you need and get quotes from verified suppliers