Тауарлар — Электр қуат және тарату

Modular Transformer Substation SESh for 35 - 110 kV Voltage

Modular Transformer Substation SESh for 35 - 110 kV Voltage

₸42,750,000-285,000,000
ELECTROSHIT Group OJSC - SAMARA TM 🇷🇺
Unified Quarry Cells for Three-Phase AC Systems

Unified Quarry Cells for Three-Phase AC Systems

₸4,275,000-14,250,000
NEZ LLC 🇷🇺
Complete Kiosk-Type Transformer Substations 25-1000 kVA

Complete Kiosk-Type Transformer Substations 25-1000 kVA

₸4,275,000-57,000,000
ENERGOMERA OJSC 🇷🇺
Complete Transformer Substations Block Type for 35-110 kV

Complete Transformer Substations Block Type for 35-110 kV

₸42,750,000-570,000,000
ELEKTRONMASH OJSC 🇷🇺

Complete Transformer Substation Type I KTPSN by ChEZAZ Russia

₸2,850,000-57,000,000
CHEAZ OJSC 🇷🇺
Complete Transformer Substations KTPM Type, 25-250 kVA, 6(10)/0.4 kV

Complete Transformer Substations KTPM Type, 25-250 kVA, 6(10)/0.4 kV

₸2,280,000-14,250,000
220 VOLT LLC 🇷🇺
Complete Distribution Device KRU-RN-6/10-UHL5-VV

Complete Distribution Device KRU-RN-6/10-UHL5-VV

₸7,125,000-22,800,000
ENERGIYA HOLDING OJSC 🇷🇺
Low Voltage Complete Distribution and Control Devices NCU

Low Voltage Complete Distribution and Control Devices NCU

₸4,275,000-28,500,000
NIPOM OJSC 🇷🇺
Complete Distribution Device KRU-K63S Series

Complete Distribution Device KRU-K63S Series

₸4,275,000-17,100,000
NEZ LLC 🇷🇺
Compact Medium Voltage Switchgear Type "TRM

Compact Medium Voltage Switchgear Type "TRM

₸4,275,000-28,500,000
PROMTEC LLC 🇷🇺
High-Voltage Gas-Insulated Switchgear KRU-E 110 kV

High-Voltage Gas-Insulated Switchgear KRU-E 110 kV

₸42,750,000-171,000,000
ZETO CJSC 🇷🇺
Modern Medium Voltage Switchgear "ROTOBLOK

Modern Medium Voltage Switchgear "ROTOBLOK

₸7,125,000-57,000,000
PROMTEC LLC 🇷🇺
Кіріспе тарату құрылғысы ВРУ

Кіріспе тарату құрылғысы ВРУ

₸427,500-1,710,000
SHELA LLC 🇷🇺
Compact Switchgear KRU-M-6(10) kV for Electrical Stations

Compact Switchgear KRU-M-6(10) kV for Electrical Stations

₸1,995,000-7,125,000
BNK LLC 🇷🇺
Complete Distribution Unit for Up to 10 kV SESh-80

Complete Distribution Unit for Up to 10 kV SESh-80

₸4,275,000-17,100,000
ELECTROSHIT Group OJSC - SAMARA TM 🇷🇺
Pro-Tok Voltage Panel for 6-35 kV Distribution Systems

Pro-Tok Voltage Panel for 6-35 kV Distribution Systems

₸14,250,000-85,500,000
PRO-TOK LLC 🇷🇺
K-319 NE Complete Switchgear Units 6(10) kV

K-319 NE Complete Switchgear Units 6(10) kV

₸4,275,000-17,100,000
NEW ERA OJSC 🇷🇺
MTT13-012-0251-54 Transformer for 12V Power Supply

MTT13-012-0251-54 Transformer for 12V Power Supply

₸7,125-22,800
IEK Holding LLC 🇷🇺
Complete Distribution Devices 35kV "Eltima+

Complete Distribution Devices 35kV "Eltima+

₸4,275,000-17,100,000
ELECTRONMASH ENGINEERING LLC 🇷🇺
Негізгі тарату щиті ГРЩ

Негізгі тарату щиті ГРЩ

₸4,275,000-17,100,000
ESI LLC 🇷🇺
Complete Switchgear Unit KU-10C for Electrical Distribution

Complete Switchgear Unit KU-10C for Electrical Distribution

₸4,275,000-17,100,000
NTEAZ ELECTRIC LLC 🇷🇺
Complete Modular Switchgear KRU-6, 10, 20, 35 U3

Complete Modular Switchgear KRU-6, 10, 20, 35 U3

₸4,275,000-17,100,000
ELECTROLABORATORY ELPEK LLC 🇷🇺
Complete Switchgear Unit for Efficient Power Distribution

Complete Switchgear Unit for Efficient Power Distribution

₸4,275,000-17,100,000
ELATRO LLC 🇷🇺
MTT13-042-0251-54 AC to DC Converter 12V/24V/36V/42V IP54 IEK

MTT13-042-0251-54 AC to DC Converter 12V/24V/36V/42V IP54 IEK

₸19,950-71,250
IEK Holding LLC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.