Тауарлар — Электр қуат және тарату

Complete Outdoor Transformer Substation 25-3200 kVA up to 10 kV

Complete Outdoor Transformer Substation 25-3200 kVA up to 10 kV

₸4,275,000-85,500,000
Elektrosila LLC 🇷🇺
Блоктық трансформаторлық станция (КТПБ)

Блоктық трансформаторлық станция (КТПБ)

₸4,275,000-85,500,000
HIGHTEK GROUP LLC 🇷🇺
Complete Transformer Substation KTPN Type 500-2500 kVA 6(10)/0.4 kV

Complete Transformer Substation KTPN Type 500-2500 kVA 6(10)/0.4 kV

₸2,280,000-14,250,000
220 VOLT LLC 🇷🇺
Complete Transformer Substation KTPB 6-35kV up to 2500kVA

Complete Transformer Substation KTPB 6-35kV up to 2500kVA

₸4,275,000-19,950,000
TRANSFORMER URAL LLC 🇷🇺
Complete Transformer Substations KTP-ELM up to 2500 kVA, 35 kV

Complete Transformer Substations KTP-ELM up to 2500 kVA, 35 kV

₸7,125,000-39,900,000
ELEKTRONMASH OJSC 🇷🇺
Трансформаторная подстанция 2КТПВ 6-2500 кВА

Трансформаторная подстанция 2КТПВ 6-2500 кВА

₸4,275,000-85,500,000
ENERGOREGION ETZ LLC 🇷🇺
Complete Transformer Substations 25-2500 kVA, 10 kV, 2KTPA-400/10/0.4-U3

Complete Transformer Substations 25-2500 kVA, 10 kV, 2KTPA-400/10/0.4-U3

₸4,275,000-85,500,000
ELECTRO PULSE OJSC 🇷🇺
Complete Pole-Mounted Transformer Substation KМТП-4-К-63-6/0.4

Complete Pole-Mounted Transformer Substation KМТП-4-К-63-6/0.4

₸2,280,000-8,550,000
Alttras OJSC 🇷🇺
Complete Block Transformer Substations (BKTP)

Complete Block Transformer Substations (BKTP)

₸7,125,000-57,000,000
KRUS-WEST LLC 🇷🇺

Complete Transformer Substations 35 (10.6) / 0.66 (0.4, 0.23) kV

₸14,250,000-285,000,000
VOLMAG CJSC 🇷🇺
Block Complete Transformer Substation Type BKTP

Block Complete Transformer Substation Type BKTP

₸4,275,000-17,100,000
ESKONT LLC 🇷🇺
Complete Block Transformer Substations for 35 and 110 kV

Complete Block Transformer Substations for 35 and 110 kV

₸42,750,000-228,000,000
CHEAZ OJSC 🇷🇺
Complete Transformer Substations from 16 to 6300 kVA

Complete Transformer Substations from 16 to 6300 kVA

₸2,850,000-57,000,000
CHEAZ OJSC 🇷🇺
Concrete Frame Transformer Substation BCTP 6-10kV

Concrete Frame Transformer Substation BCTP 6-10kV

₸4,275,000-17,100,000
NEZ LLC 🇷🇺
Complete Outdoor Transformer Substation 25kVA to 3150kVA

Complete Outdoor Transformer Substation 25kVA to 3150kVA

₸4,275,000-28,500,000
KCK LLC 🇷🇺
Complete Block Transformer Substation KTPB-E

Complete Block Transformer Substation KTPB-E

₸42,750,000-855,000,000
ENERGOSTAR LLC 🇷🇺
Complete Transformer Substation KTPS, 25-250 kVA, 6(10)/0.4 kV

Complete Transformer Substation KTPS, 25-250 kVA, 6(10)/0.4 kV

₸855,000-8,550,000
220 VOLT LLC 🇷🇺
Complete Transformer Substation KTPB 110 for Outdoor Installation

Complete Transformer Substation KTPB 110 for Outdoor Installation

₸42,750,000-171,000,000
CHEAZ OJSC 🇷🇺
Complete Transformer Substation KTP TU 3434-011-33874352-2009

Complete Transformer Substation KTP TU 3434-011-33874352-2009

₸1,425,000-8,550,000
KazanElektroshchit LLC 🇷🇺
Complete Transformer Substations KTP for Power Distribution

Complete Transformer Substations KTP for Power Distribution

₸4,275,000-28,500,000
NEZ LLC 🇷🇺
KTP-Smart Transformer 6(10)/0.4kV

KTP-Smart Transformer 6(10)/0.4kV

₸4,275,000-14,250,000
ZETZ LLC 🇷🇺
Complete Transformer Substations BКTP 25-6300 kVA up to 35 kV

Complete Transformer Substations BКTP 25-6300 kVA up to 35 kV

₸4,275,000-85,500,000
EP-A LLC 🇷🇺

Complete Transformer Substation KTPB(M) 110kV

₸71,250,000-285,000,000
IZVA LLC 🇷🇺
Complete Transformer Substation KTP-VV (VK)-1-25-10(6)/0.4-UXL1

Complete Transformer Substation KTP-VV (VK)-1-25-10(6)/0.4-UXL1

₸427,500-1,710,000
Alttras OJSC 🇷🇺
Complete Transformer Substations up to 35 kV KTP Series (BKT)

Complete Transformer Substations up to 35 kV KTP Series (BKT)

₸8,550,000-57,000,000
ELTERA LLC 🇷🇺
Complete Transformer Substations KTPN Type 500-2500 kVA 6(10)/0.4 kV

Complete Transformer Substations KTPN Type 500-2500 kVA 6(10)/0.4 kV

₸4,275,000-19,950,000
220 VOLT LLC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.