Тауарлар — Электр қуат және тарату

High Voltage Oil Transformers for Power Distribution

High Voltage Oil Transformers for Power Distribution

₸14,250,000-85,500,000
ELMAS (UETM) LLC 🇷🇺
AC Power Supply SKAT-VN.24/27AC - 24V/27V Output

AC Power Supply SKAT-VN.24/27AC - 24V/27V Output

₸4,275-17,100
BASTION CJSC 🇷🇺
Автотрансформатор типі АТДЦТН-63000/220/110 У1,УХЛ1,ХЛ1

Автотрансформатор типі АТДЦТН-63000/220/110 У1,УХЛ1,ХЛ1

₸42,750,000-142,500,000
TOGLIATTI TRANSFORMER LLC 🇷🇺
TM-630 10/0.4 Oil Distribution Transformer 630 kVA

TM-630 10/0.4 Oil Distribution Transformer 630 kVA

₸1,425,000-4,275,000
Alttras OJSC 🇷🇺
SKAT-UPS үздіксіз қуат көзі

SKAT-UPS үздіксіз қуат көзі

₸42,750-2,850,000
BASTION CJSC 🇷🇺
Three-Phase Oil-Filled Dual-Winding Transformer TRDP-12500/35J

Three-Phase Oil-Filled Dual-Winding Transformer TRDP-12500/35J

₸42,750,000-142,500,000
ELMAS (UETM) LLC 🇷🇺
Трансформатор ТС-630/6-У3

Трансформатор ТС-630/6-У3

₸4,275,000-14,250,000
KPM LLC 🇷🇺
ТИМ трансформаторы

ТИМ трансформаторы

₸142.50-1,140
STRELA OJSC 🇷🇺
SKAT-UPS DIN үздіксіз қуат көзі

SKAT-UPS DIN үздіксіз қуат көзі

₸42,750-142,500
BASTION CJSC 🇷🇺
Трансформатор ОСО-0,25-09 УХЛ 3 380/110

Трансформатор ОСО-0,25-09 УХЛ 3 380/110

₸4,275-14,250
IK-1 FSIN of Russia in Kostroma Oblast 🇷🇺
Трансформатор күштік ОЛ-НТЗ-0,63(1,0)/35-III

Трансформатор күштік ОЛ-НТЗ-0,63(1,0)/35-III

₸427,500-1,425,000
NTZ VOLKHOV LLC 🇷🇺
Трансформатор күштік майлы ТМН-6300/35 У1,УХЛ1,ХЛ1

Трансформатор күштік майлы ТМН-6300/35 У1,УХЛ1,ХЛ1

₸7,125,000-22,800,000
TOGLIATTI TRANSFORMER LLC 🇷🇺
Transformator TSZM-63-380/230 OM5 U/Uн-0

Transformator TSZM-63-380/230 OM5 U/Uн-0

₸427,500-1,140,000
ELLIPS LLC 🇷🇺

FAQ

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.