Part of water steam turbine T-121: high pressure cylinder assembly, flowing part of medium pressure cylinder including stop valv

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

The project of modernisation of Turbine T-100-130 consists in replacement of units and parts of the turbine working at high temperatures and exhausted resource, and includes the following types of works:
- replacement of the complete CVD;
- replacement of camshaft distributor;
- replacement of stop and control valves;
- reconstruction of the front bearing unit assembly;
- replacement of the DDC flow assemblies, including new rotor SD and stator flanging;
- replacement of thrust bearing liners;
- replacement of the bearing liners of the SR rotor;
- replacement of two safety valves on the lower heating extraction pipeline with one safety valve;
- replacement of pipelines (with necessary fittings) of the turbine itself in the amount necessary for installation of new supplied equipment to replace the dismantled one;
- replacement of turbine cladding.
Designation of the turbine after modernisation T-121-12,8 PR2

Specifications

Maximum electrical power
121
Rated electrical power
121
Average volume of modernization
in addition to replacement of resource units and parts of the high-pressure cylinder; additionally includes replacement of the medium-pressure flow part.
Maximum scope of modernization
replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Contact Us

Contact Our Import Specialists

WhatsApp (Recommended)

For fastest response and immediate assistance with pricing, availability, and ordering.

Email

For detailed inquiries, documentation requests, and formal communications.

info@tonzar.com

Business Hours

Monday - Friday: 9:00 AM - 6:00 PM (GMT+4)

Our WhatsApp support is available outside business hours for urgent inquiries.

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.