Water vapour turbine part: high pressure cylinder assembly, medium pressure cylinder assembly, including stop valve and control

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

The project of modernisation of turbine T-100-130 provides for replacement of units and parts of the turbine operating at high temperatures and exhausted resource, and includes types of works - replacement of:
- complete DDC and CSD with installation on the existing foundation and new housings of the front bearing block and middle (thrust bearing) bearing
- control and locking valves
- cam-type distributor of the UA control valves
- CND flow section
- control diaphragm servomotor
- foundation frames under the housings of the front bearing block and the centre (thrust) bearing block
- two safety valves on the lower heating extraction pipeline for one safety valve
- organisation of additional steam extraction behind the CVD from the bypass pipe of the CVD-CSD to the general station collector with a flow rate of up to 70 t/h.
Designation of the turbine after Modernisation: T-110/120-12,8 PR2.

Specifications

Minimum scope of modernization
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Average volume of modernization
In addition to the replacement of high-pressure and medium-pressure cylinder resource units and parts; additionally includes the replacement of low-pressure flow section; and by-pass tubes from high-pressure cylinder to medium-pressure cylinder.
Maximum scope of modernization
in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation
Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.