Товарлар — Өнөр жай автоматташтыруу
Ячейка ЦО 36905-126-00 (Центральный обработчик) БЛОКтун кирет
сом 26,100-156,600
Federal State Unitary Enterprise "Production Association "OKTYABR" 🇷🇺
Пульт формирования контрольдук сигналдар ЭТПК 2.10, НБИЕ.437191.006.010
сом 78,300-261,000
UNTs-ET LLC 🇷🇺
Communication and Control Block BSU IBYAL.411111.044
сом 26,100-156,600
Federal State Unitary Enterprise "Scientific Production Association "Analitpribor" 🇷🇺
Command Control Panel for Emergency Notification System P-166M KPU UYID.466259.002
сом 15,660-62,640
AZIMUT OJSC 🇷🇺
27.Т.257.00.00.000-07 Бирдиктүү башкаруу панелин (УПУ)
сом 783,000-2,610,000
RATEP-INNOVATION LLC 🇷🇺
Программалык-техникалык комплекс «Промысел-1» (ПТК «Промысел-1»)
сом 2,610,000-15,660,000
PJSC GAZPROM AUTOMATION 🇷🇺
Multi-Point Air Parameter Monitoring Power Supply and Alarm BPS-3 IBYAL.426479.046
сом 13,050-41,760
Federal State Unitary Enterprise "Scientific Production Association "Analitpribor" 🇷🇺
Модулдардын башкаруу комплекттери объекттик контроллерлер үчүн байланыш концентратору ОК-ЭЛ тип 3 (EK)
сом 78,300-261,000
EXPERTSTROYPROEKT LLC 🇷🇺
Промышленный контроллер ПК «Стабур» 07 телекоммуникация шкафтар үчүн
сом 78,300-313,200
PROMSVYAZ LLC 🇷🇺
Объекттук контроллер модулунун башкаруу комплекттери монтаждоо топтому жана негизги программалык камсыздоо М2
сом 78,300-261,000
EXPERTSTROYPROEKT LLC 🇷🇺
FP-01-MD Металл корпусундагы борбордук блок ЖК-дисплей жана клавиатура менен
сом 7,830-31,320
NITP NITA LLC 🇷🇺
FAQ
•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.