Control Valves & Actuators
Industrial Switches & Gateways
Monitoring & Diagnostic Systems
Building Systems Controllers (Access, Fire, Lighting, Elevators)
SCADA & DCS Control Systems
PLCs, Controllers & Control Units
Industrial Connectors & Contacts
Electronics Educational Kits
Elevator Control Systems
Operator Panels & HMI
Other Industrial Automation
产品 — 工业自动化
Central Processing Unit Cell for BLOCK System 36905-126-00
¥2,160-12,960
Federal State Unitary Enterprise "Production Association "OKTYABR" 🇷🇺
Communication and Control Block BSU IBYAL.411111.044
¥2,160-12,960
Federal State Unitary Enterprise "Scientific Production Association "Analitpribor" 🇷🇺
Command Control Panel for Emergency Notification System P-166M KPU UYID.466259.002
¥1,296-5,184
AZIMUT OJSC 🇷🇺
Unified Control Panel for Locomotive Equipment (UCP) Model 27.T.257.00.00.000-07
¥64,800-216,000
RATEP-INNOVATION LLC 🇷🇺
Automated Process Control System "Promysel-1" (PTK "Promysel-1")
¥216,000-1,296,000
PJSC GAZPROM AUTOMATION 🇷🇺
Surge Protection Board for Signal and Low-Voltage Power Circuits BGr-4
¥64.80-259.20
OKHRANNAIA TEKHNIKA LLC 🇷🇺
Multi-Point Air Parameter Monitoring Power Supply and Alarm BPS-3 IBYAL.426479.046
¥1,080-3,456
Federal State Unitary Enterprise "Scientific Production Association "Analitpribor" 🇷🇺
Safe Connection Device for Modem to 35kV Power Network G2-OV-CAP35
¥6,480-25,920
OJSC "OKB "GIPERCOM" 🇷🇺
Data Exchange Control Module Set for Object Controllers OK-EL Type 3 (EK)
¥6,480-21,600
EXPERTSTROYPROEKT LLC 🇷🇺
常见问题
•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.