Товарлар — Танктар, идиштер жана танктар
Water Tower VBR-160 for Efficient Water Supply Management
сом 1,305,000-4,176,000
RTP Prigorodnoe LLC 🇷🇺
Double-Walled Horizontal Cylindrical Steel Tank 2RT - 50 (35+15)
сом 365,400-1,305,000
PARITET LLC 🇷🇺
ESV/ESG Series Beer and Beverage Storage Tank with Autonomous Cooling System
сом 261,000-5,220,000
METALLSTROYMASH LLC 🇷🇺
Wastewater Vacuum Collection System with Tank "UV-C INEMA" - 360-01
сом 783,000-2,610,000
YAMYA-ENGINEERING LLC 🇷🇺
Intermediate Buffer Tank Type BP for Milk Storage and Processing
сом 130,500-469,800
ZMM I PO LLC 🇷🇺
Welded Vessels and Equipment from Other Metals, Volume 0.01 to 200m³
сом 522,000-10,440,000
PMZ LLC 🇷🇺
Post your Buy Requirement
Get Quotes from Verified Suppliers
Убакытты үнөмдөңүз
Vacuum Wastewater Collection Unit with Tank "UVC INEMA" - 200-02
сом 391,500-1,305,000
YAMYA-ENGINEERING LLC 🇷🇺
Wastewater Disposal Station for Domestic Liquid Waste "AGMA-SL
сом 783,000-15,660,000
GIPERION LLC 🇷🇺
Horizontal Steel Underground Double-Wall Tank 30 m³ RGSPD-30
сом 261,000-1,566,000
BEREZOVSKY TANK PLANT LLC 🇷🇺
Roshnovsky Water Tower VBR for Industrial and Agricultural Use
сом 783,000-10,440,000
SPECSTAL LLC 🇷🇺
Horizontal Buffer Tank 500BE-1/1 Black BRM-1.6 (500BRM-1/1-BV) URM.01.00.00.000
сом 783,000-2,610,000
KURGANHIMMASH LLC 🇷🇺
Emergency Storage Tank V=130 m3 Model GE-6.3-3200-3(100EA-1/1).00.000
сом 3,654,000-13,050,000
KURGANHIMMASH LLC 🇷🇺
FAQ
•What information does a fabricator need to quote a custom tank?
Five things: stored medium and its temperature, working volume, orientation and installation type (underground, surface, elevated), site climate, and any internal equipment such as heating coils or mixers. With that, the plant proposes material, wall thickness and a general arrangement drawing, usually within a week, and a firm price tied to current steel cost.
•How are large tanks shipped if they exceed container dimensions?
Three routes are used. Vessels under roughly 3.2 metres diameter travel whole by truck or flat-rack. Larger tanks are fabricated in shell sections, shipped compactly, then welded on site — the plant supplies assembly drawings and can send a welding supervisor. Field-erected designs bolt or weld from panels for the biggest volumes.
•Are septic tanks and treatment plants sized for local regulations?
Suppliers size treatment equipment from your inflow data — population equivalent or daily volume and contamination levels — and guarantee outlet parameters in the contract. You then check those outlet figures against your national discharge norms. Plants regularly adjust process stages, adding tertiary treatment or disinfection, to meet stricter local limits.
•What corrosion protection is applied for underground installation?
Standard practice is abrasive blasting followed by reinforced bitumen-polymer or polyurethane external coating, with thickness measured and recorded. Internally, the lining matches the medium — from epoxy for fuels to food-grade coatings or bare stainless steel. Cathodic protection points can be welded in if your site plan uses them.
•How long does fabrication take from drawing approval?
Simple single-wall tanks up to 25 cubic metres typically take 3–5 weeks from approved drawings. Stainless process vessels, double-wall fuel tanks and packaged treatment plants run 6–10 weeks depending on complexity and internal equipment. Add transport: 1–2 weeks overland to Central Asia, 4–6 weeks by sea to the Gulf or Africa.