Товары — Электропитание и распределение

High Voltage Oil Transformers for Power Distribution

Трансформаторы высоковольтные масляные

₽5 000 000-15 000 000
ООО "ЭЛЬМАШ (УЭТМ)" 🇷🇺
AC Power Supply SKAT-VN.24/27AC - 24V/27V Output

Источник переменного тока SKAT-VN.24/27AC

₽1 500-3 000
ЗАО "БАСТИОН" 🇷🇺
Three-Winding Autotransformer ATDCTN-63000/220/110 U1, UHL1, HL1

Автотрансформатор типа АТДЦТН-63000/220/110 У1,УХЛ1,ХЛ1

₽15 000 000-25 000 000
ООО "ТОЛЬЯТТИНСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Uninterruptible Power Supply SKAT-UPS for Security Systems

Источник бесперебойного питания SKAT-UPS

₽15 000-500 000
ЗАО "БАСТИОН" 🇷🇺
Dry Transformer TS 100/6(10)/0.4

Трансформатор сухой ТС 100/6(10)/0,4

₽250 000-400 000
ООО "ЗЭМ" 🇷🇺
Three-Phase Oil Power Transformer TRDNS-32000/110-U1

Трехфазный масляный силовой трансформатор ТРДНС-32000/110-У1

₽15 000 000-25 000 000
ООО "ВОРОНЕЖСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Three-Phase Dry Power Transformer 630 kVA, 6 kV - TS-630/6-U3

Трансформатор ТС-630/6-У3

₽1 500 000-2 500 000
ООО "КПМ" 🇷🇺
Miniature TIM Impulse Transformer for Printed Circuit Boards

Трансформатор ТИМ

₽50-200
АО "СТРЕЛА" 🇷🇺
Oil Power Transformer TMN-2500/110 U1, UHL1, HL1

Трансформатор силовой масляный типа ТМН-2500/110 У1,УХЛ1,ХЛ1

₽7 000 000-12 000 000
ООО "ТОЛЬЯТТИНСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Uninterruptible Power Supply SKAT-UPS DIN

Источник бесперебойного питания SKAT-UPS DIN

₽15 000-25 000
ЗАО "БАСТИОН" 🇷🇺
Transformer OSO-0.25-09 UHL 3 380/110 for Portable Lighting

Трансформатор ОСО-0,25-09 УХЛ 3 380/110

₽1 500-2 500
ФКУ ИК-1 УФСИН РОССИИ ПО КОСТРОМСКОЙ ОБЛАСТИ 🇷🇺
Low-Power Single-Phase Power Transformer OL-NTZ-0.63(1.0)/35-III

Трансформатор силовой ОЛ-НТЗ-0,63(1,0)/35-III

₽150 000-250 000
ООО "НТЗ" ВОЛХОВ" 🇷🇺
Oil Power Transformer TMN-6300/35 U1, UHL1, HL1

Трансформатор силовой масляный ТМН-6300/35 У1,УХЛ1,ХЛ1

₽2 500 000-4 000 000
ООО "ТОЛЬЯТТИНСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Oil Power Transformer TRDCN-63000/220 U1, UHL1, HL1

Трансформатор силовой масляный типа ТРДЦН-63000/220 У1,УХЛ1,ХЛ1

₽15 000 000-25 000 000
ООО "ТОЛЬЯТТИНСКИЙ ТРАНСФОРМАТОР" 🇷🇺
Protected Marine Transformer 63kVA for Ship Installation TSZM-63-380/230

Трансформатор ТСЗМ-63-380/230 ОМ5 У/Ун-0

₽150 000-200 000
ООО "ЭЛЛИПС" 🇷🇺
Protected Power Transformer 10 kVA for Marine Applications TSZM-10-380/230

Трансформатор ТСЗМ-10-380/230 ОМ5 У/Ун-0

₽75 000-120 000
ООО "ЭЛЛИПС" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.