Тауарлар — Қазандар, оттықтар және су жылыту жүйелері
Centrifugal Steam and Compressed Air Separator Model SPG, DN 200 mm, PN 25 bar
₸427,500-1,710,000
ADL Trading House LLC 🇷🇺
Dual-Block Modulating Gas Burner TLX2040 M-.MD.S.RU.A.8.125.EI
₸7,125,000-22,800,000
Burner Equipment Plant LLC 🇷🇺
Arderia D10 Wall-Mounted Gas Heating Boiler (Up to 100 kW)
₸171,000-456,000
ENGINEERING CENTER "APRIL" LLC 🇷🇺
Domestic Gas Heating Appliance with Forced Circulation, VilTerm A 24 TC
₸199,500-570,000
YUGENERGOPROM LLC 🇷🇺
Energy-independent Floor Gas Heating Boiler KOV-14SVPS JAR Compact
₸171,000-456,000
SIGNAL-HEATENGINEERING LLC 🇷🇺
Low Emission Modulating Gas-Diesel Burner N925X MG.MD.LP.RU.A.8.65.EI
₸4,275,000-14,250,000
Burner Equipment Plant LLC 🇷🇺
Gas-Diesel Modular Burner G225X MG.MD.LP.RU.A.8.50.EC
₸4,275,000-14,250,000
Burner Equipment Plant LLC 🇷🇺
Water Heating Electric Boiler KVKs2325 with Boiling Layer by KRAZMASH, Russia
₸7,125,000-22,800,000
KRASMASH OJSC 🇷🇺
Modular Gas Burner with Low NOx Emissions N1060X M-.MD.LP.RU.A.8.80.EI
₸4,275,000-14,250,000
Burner Equipment Plant LLC 🇷🇺
Water Heating Boiler Type KV-GM with Thermal Power from 2.5 to 68.0 MW
₸19,950,000-570,000,000
PSKOVSKY KOTELNY ZAVOD LLC 🇷🇺
Three-Pass Water Heating Boiler for Efficient Heating 1.0-20 MW NORD KН 3.70
₸4,275,000-85,500,000
NORD LLC 🇷🇺
Three-Way Water Heating Boilers for Efficient Heating 1.0-20 MW NORD Type KN 3.50
₸4,275,000-85,500,000
NORD LLC 🇷🇺
Three-Pass Hot Water Boiler for Heating Applications 1-20 MW NORD Type KN 3.40
₸4,275,000-85,500,000
NORD LLC 🇷🇺
Three-Pass Water Heating Boiler for Efficient Heating 1.0-20 MW NORD KН 3.15-10
₸4,275,000-85,500,000
NORD LLC 🇷🇺
Three-Pass Water Heating Boiler for Efficient Heating 1.0-20 MW NORD Type KN 3.15-TX
₸4,275,000-85,500,000
NORD LLC 🇷🇺
Three-Pass Hot Water Boiler for Heating 1.0-20 MW NORD Type KN 3.15
₸7,125,000-85,500,000
NORD LLC 🇷🇺
FAQ
•Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
•Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
•What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
•How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
•Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.