Тауарлар — Қазандар, оттықтар және су жылыту жүйелері

Multi-Purpose Heating Pipeline Plates for Thermal Systems PO-3

Multi-Purpose Heating Pipeline Plates for Thermal Systems PO-3

₸4,275-17,100
STROYINDUSTRIYA LLC 🇷🇺
Heat Distribution Plate for Various Applications PO-1

Heat Distribution Plate for Various Applications PO-1

₸4,275-17,100
STROYINDUSTRIYA LLC 🇷🇺
Single-Pass Water Heating Boiler 0.075 MW Nord Series

Single-Pass Water Heating Boiler 0.075 MW Nord Series

₸427,500-1,425,000
NORD LLC 🇷🇺
Continuous Electric Water Boiler KEND-50M OM4 IABE.681945.015-03

Continuous Electric Water Boiler KEND-50M OM4 IABE.681945.015-03

₸71,250-228,000
CJSC "CONCERN "TERMAL" 🇷🇺
Medium Pressure Gas Burner GGS-B-1.2, 1.2MW Heating Capacity

Medium Pressure Gas Burner GGS-B-1.2, 1.2MW Heating Capacity

₸712,500-2,280,000
PROGRESS LLC 🇷🇺
Gas Burner Device UГ-САБК-ЕМ-28-4 for Heating Systems

Gas Burner Device UГ-САБК-ЕМ-28-4 for Heating Systems

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Domestic Gas Heating Appliance RGA 8 xChange SG

Domestic Gas Heating Appliance RGA 8 xChange SG

₸128,250-342,000
RGA OJSC 🇷🇺
Wall-Mounted Gas Heating Boiler Arderia D24 (up to 100 kW)

Wall-Mounted Gas Heating Boiler Arderia D24 (up to 100 kW)

₸171,000-456,000
ENGINEERING CENTER "APRIL" LLC 🇷🇺
Gas Burner Device UГ-САБК-АТ-8-4 for Heating Systems

Gas Burner Device UГ-САБК-АТ-8-4 for Heating Systems

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Technical Maintenance of Automated Compact Boiler Units

Technical Maintenance of Automated Compact Boiler Units

₸1,425,000-11,400,000
NIIMORTEPLOTECHNIKI OJSC 🇷🇺
Continuous Electric Water Boiling Unit KEN-50

Continuous Electric Water Boiling Unit KEN-50

₸213,750-712,500
ELINOX LLC 🇷🇺
Gas Burner Device for KSG-8P LUCH (Liquefied Gas)

Gas Burner Device for KSG-8P LUCH (Liquefied Gas)

₸14,250-45,600
TGA LLC 🇷🇺
Industrial Block Gas Burner GB-0.34

Industrial Block Gas Burner GB-0.34

₸427,500-1,425,000
BKMZ OJSC 🇷🇺
Fuel Gas Heater 400TPG-4.0-1.6-M1 for Heating Gaseous Media

Fuel Gas Heater 400TPG-4.0-1.6-M1 for Heating Gaseous Media

₸4,275,000-14,250,000
PK "TT" OJSC 🇷🇺
Electric Water Heater KVE-15 for Efficient Heating

Electric Water Heater KVE-15 for Efficient Heating

₸71,250-199,500
TRADE MECHANICS LLC 🇷🇺
Gas Burner UГ-САБК-АТ-11.6-9 for Heating Systems

Gas Burner UГ-САБК-АТ-11.6-9 for Heating Systems

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Gas Burner Device UG-SABK-AT-18.2-5 for Heating Systems

Gas Burner Device UG-SABK-AT-18.2-5 for Heating Systems

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Continuous Electric Water Heater KEN-100

Continuous Electric Water Heater KEN-100

₸213,750-712,500
ELINOX LLC 🇷🇺
Electric Water Heater KVE-15 for Catering Businesses

Electric Water Heater KVE-15 for Catering Businesses

₸71,250-228,000
TORGOVAYA MEKHANIKA OJSC 🇷🇺
Electric Water Heater KVE-30 for Efficient Heating

Electric Water Heater KVE-30 for Efficient Heating

₸71,250-199,500
CHUVASHTORGTECHNICA OJSC 🇷🇺
Block Gas Burner GBL-0.35P-MG-V

Block Gas Burner GBL-0.35P-MG-V

₸712,500-2,280,000
STARORUSPRIBOR LLC 🇷🇺
Gas Burner Device UG-SABK-AT-8-5

Gas Burner Device UG-SABK-AT-8-5

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Electric Water Heater KVE-15 for Commercial Use

Electric Water Heater KVE-15 for Commercial Use

₸71,250-228,000
TRADE MECHANICS LLC 🇷🇺
Electric Water Boiler KND-130 Continuous Action

Electric Water Boiler KND-130 Continuous Action

₸199,500-570,000
TULATORGTECHNIKA OJSC 🇷🇺
Wall-Mounted Gas Boiler BaltGaz Turbo E 10 (10 kW)

Wall-Mounted Gas Boiler BaltGaz Turbo E 10 (10 kW)

₸171,000-456,000
BALTGAZ LLC 🇷🇺
Gas Burner Device UGT-SABK-E-14.2-4 for Heating Systems

Gas Burner Device UGT-SABK-E-14.2-4 for Heating Systems

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Gas Burner Device UГ-САБК-ЕМ-29-2 for Heating Systems

Gas Burner Device UГ-САБК-ЕМ-29-2 for Heating Systems

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Wall-Mounted Gas Heating Boiler MINORCA CTFS 18 CU

Wall-Mounted Gas Heating Boiler MINORCA CTFS 18 CU

₸171,000-456,000
Fondital LLC 🇷🇺
Electric Water Boiler KVE-30 for Food Service

Electric Water Boiler KVE-30 for Food Service

₸71,250-228,000
TORGOVAYA MEKHANIKA OJSC 🇷🇺
Gas Burner Device UG-SABK-AT-28-1 for Heating Systems

Gas Burner Device UG-SABK-AT-28-1 for Heating Systems

₸42,750-142,500
SERVICEGAZ LLC 🇷🇺
Wall-Mounted Gas Boiler AUROS Modification C (KA11124)

Wall-Mounted Gas Boiler AUROS Modification C (KA11124)

₸199,500-522,500
WARM LLC 🇷🇺
Compact Gas Heating Boiler KOV-10SVPS ZHAR

Compact Gas Heating Boiler KOV-10SVPS ZHAR

₸171,000-456,000
SIGNAL-HEATENGINEERING LLC 🇷🇺
Electric Water Heater KVE-15 for Catering Use

Electric Water Heater KVE-15 for Catering Use

₸42,750-142,500
CHUVASHTORGTECHNICA OJSC 🇷🇺
Thermofakel 65 Gas Burner

Thermofakel 65 Gas Burner

₸427,500-1,425,000
VOLGATERM LLC 🇷🇺
Industrial Block Gas Burner 0.85 MW - GB-0.85

Industrial Block Gas Burner 0.85 MW - GB-0.85

₸712,500-2,280,000
BKMZ OJSC 🇷🇺

FAQ

Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.