Товарлар — Өнөр жай автоматташтыруу
Komplekt modulder BUV 725
сом 261,000-1,044,000
V.V. Tikhomirov Research Institute of Instrument Engineering OJSC 🇷🇺
Relay Block BR for Industrial Atmosphere Control Systems
сом 7,830-26,100
Federal State Unitary Enterprise "Scientific Production Association "Analitpribor" 🇷🇺
Avtomatikasyn bashqaruu gaz taratuu stantsiyasy (SAB GRS) "KURS-2"
сом 783,000-3,132,000
SAROV-VOLGOGAZ LLC 🇷🇺
Control Station Panel for Electrical Distribution - Model ЩСУ ТУ 3434-010-33874352-2015
сом 78,300-313,200
KazanElektroshchit LLC 🇷🇺
Electric Centralization Relay Block VIII-65, Drawing No. 14046.00.00B-03
сом 13,050-46,980
ELTEZA OJSC 🇷🇺
Telemechanical Control Point TК 365.3/1 for Autonomous Lighting Management
сом 31,320-156,600
RESOURCE LLC 🇷🇺
Измерүү-каттоо комплекси колтюбингдик орнотуулар үчүн
сом 783,000-3,132,000
RGM-Oil-Gas-Service LLC 🇷🇺
Electrical Centralization Relay Block PS-220M, Drawing No. 14469.00.00B-01
сом 26,100-156,600
ELTEZA OJSC 🇷🇺
Техникалык каражаттардын комплекси программаланбаган логика КТС НПЛ
сом 783,000-3,132,000
FIZPRIBOR Moscow LLC 🇷🇺
Модулдарды башкаруу комплекти сигналдык объект контроллери ОК-ЭЛ тип 2
сом 31,320-156,600
EXPERTSTROYPROEKT LLC 🇷🇺
Relay Block for Electric Centralization System MII, Drawing No. 14040.00.00B-03
сом 13,050-46,980
ELTEZA OJSC 🇷🇺
Төмөн вольттуу комплекттүү түзүлүштөр ENTEL соода маркасы. Башкаруу станцияларынын щиттери (ЩСУ) 100-400-4-30F1-УХЛ3С
сом 130,500-522,000
ZIT LLC 🇷🇺
Программалык-аппараттык комплекс автоматташтыруу жана телемеханизация «ИНФОЛУК»
сом 783,000-5,220,000
NGP INFORM LLC 🇷🇺
FAQ
•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.