Товарлар — Кабелдер жана зымдар

Кабель КСПЭ 5е 2х2х0,52

Кабель КСПЭ 5е 2х2х0,52

сом 78.30-313.20
INFORMSYSTEM LLC 🇷🇺
Кабель күчтүү 0,66 жана 1 кВ ВБШвнг(А)-LSLTх

Кабель күчтүү 0,66 жана 1 кВ ВБШвнг(А)-LSLTх

сом 52.20-522
Samara Cable Company OJSC 🇷🇺
Kabel silovoy KGTП-XЛ-220/380-2

Kabel silovoy KGTП-XЛ-220/380-2

сом 78.30-261
Alyur Cable Plant LLC 🇷🇺
Kabelder

Kabelder

сом 78.30-313.20
ENERGO-KABEL OJSC 🇷🇺
Кабель КУГВЭВнг(А)-LS

Кабель КУГВЭВнг(А)-LS

сом 26.10-313.20
KIRSKABEL OJSC 🇷🇺
Кабель ПвЭКШвнг(А)

Кабель ПвЭКШвнг(А)

сом 130.50-522
LLC "NPO "PZSK" 🇷🇺
Кабелдер күч EPREM РэКаВнг(А)

Кабелдер күч EPREM РэКаВнг(А)

сом 783-3,132
EM-KABEL LLC 🇷🇺
Кабель күч ПвВГЭ 5*2,5ок(N,PE)-0.66

Кабель күч ПвВГЭ 5*2,5ок(N,PE)-0.66

сом 52.20-208.80
KIRSKABEL OJSC 🇷🇺
Kabel KIS-PKShp 2x2x0,78

Kabel KIS-PKShp 2x2x0,78

сом 78.30-313.20
TPD PARITET LLC 🇷🇺
Кабель АВБШвнг(А)

Кабель АВБШвнг(А)

сом 52.20-522
EKZ OJSC 🇷🇺
Kabel silovoy PvVG-Png(A)

Kabel silovoy PvVG-Png(A)

сом 26.10-156.60
KAVKAZKABEL LLC 🇷🇺
Кабель КИС-РВГ-Кнг(А)-FRLS 1х2х0,60

Кабель КИС-РВГ-Кнг(А)-FRLS 1х2х0,60

сом 78.30-313.20
TPD PARITET LLC 🇷🇺
Антивибрация кабели 03B1F1

Антивибрация кабели 03B1F1

сом 261-1,566
GTLAB LLC 🇷🇺
Күч кабели ПБПнг(А)-HF

Күч кабели ПБПнг(А)-HF

сом 78.30-313.20
KAVKAZKABEL LLC 🇷🇺
ИнСил-АРэпЭКП күч кабели

ИнСил-АРэпЭКП күч кабели

сом 78.30-522
EKZ OJSC 🇷🇺
Kabeli silovye EPREM ARVGng(A)

Kabeli silovye EPREM ARVGng(A)

сом 52.20-313.20
EM-KABEL LLC 🇷🇺
Кабель СБПВБэПнг(А)-HF

Кабель СБПВБэПнг(А)-HF

сом 78.30-313.20
SARANSKKABEL LLC 🇷🇺
Кабель АКВВГЭнг(А)-LS

Кабель АКВВГЭнг(А)-LS

сом 52.20-313.20
EKZ OJSC 🇷🇺
Управуу кабелдер КУПЭВнг(А)-ХЛ

Управуу кабелдер КУПЭВнг(А)-ХЛ

сом 78.30-365.40
Podolsk Cable OJSC 🇷🇺

FAQ

How do Russian cable types correspond to IEC designations?
Construction principles match: VVG corresponds to copper PVC-insulated power cable of the IEC 60502-1 type, AVBbShv to armoured aluminium cable, and SIP to aerial bundled conductor. Cross-sections follow the same square-millimetre series. Suppliers issue comparison sheets and full construction drawings so your engineers can approve equivalence against project specifications.
What is the minimum order — can I buy less than a full drum?
The drum is the practical unit: cutting opens a factory length and most plants avoid it for small remnants. However, plants will wind custom lengths to order — say, 12 drums of 350 metres to match your feeder runs — which is more useful than buying standard lengths and generating offcuts. Project lots start around 5–10 km total.
Are fire-rated and halogen-free executions available?
Yes. Most power and control families come in low-smoke halogen-free (ng-LS, ng-HF) and fire-resistant (FR) executions, tested for flame spread, smoke density and circuit integrity under fire. State the fire performance class your code requires and the plant will match it and attach the corresponding test protocols.
What documentation supports a utility tender submission?
Plants provide type test protocols, routine test certificates per drum, EAC conformity declarations, construction drawings and ISO 9001 factory certification. For medium voltage cable, partial discharge and voltage test records are included. This package normally satisfies tender technical files; specific national homologation, where required, is discussed case by case.
How is cable shipped and how long does it take?
Drums load into containers or open wagons; a 40-foot container carries roughly 15–25 tonnes of cable depending on drum sizes. Production of non-stock positions takes 2–5 weeks. Trucking to Central Asia adds 7–14 days; sea freight from Novorossiysk or St. Petersburg to the Gulf or East Africa runs 25–45 days.
Can conductors be supplied in aluminium to cut project cost?
Yes, and this is a major lever: aluminium low voltage cable, with 531 listings here, prices well below copper for distribution feeders where the larger cross-section is acceptable. Suppliers will recalculate your copper schedule into aluminium equivalents, showing the cross-section conversion and the cost difference per kilometre, so you can decide line by line.