Тауарлар — Бекіткіштер мен жабдықтар

90-Degree Angle Plate with 6 Holes SMA 624, 80x94x120 mm

90-Degree Angle Plate with 6 Holes SMA 624, 80x94x120 mm

₸4,275-14,250
SZ EMI OJSC 🇷🇺
Joint Gasket PSN-50 (12 mm)

Joint Gasket PSN-50 (12 mm)

₸427.50-1,710
LITMASHDETAL OJSC 🇷🇺
Angled Bracket 30 Degrees for STRUT Profile CLM50D-UNS-030-40

Angled Bracket 30 Degrees for STRUT Profile CLM50D-UNS-030-40

₸142.50-855
IEK Holding LLC 🇷🇺
Reinforced Console SMO 21x61x41x2.5D-000 for Cable Trays

Reinforced Console SMO 21x61x41x2.5D-000 for Cable Trays

₸4,275-17,100
SZ EMI OJSC 🇷🇺
Bolt Support Bar PПБ-65 for Rail Insulation (1448.005)

Bolt Support Bar PПБ-65 for Rail Insulation (1448.005)

₸142.50-855
LITMASHDETAL OJSC 🇷🇺
Hinge Connection Plate 35mm CLP1SH-035-1

Hinge Connection Plate 35mm CLP1SH-035-1

₸142.50-855
IEK Holding LLC 🇷🇺
High-Strength Bolt Sets for Pre-Tensioning - HR System

High-Strength Bolt Sets for Pre-Tensioning - HR System

₸712.50-8,550
MMK-METIZ OJSC 🇷🇺
Intermediate Side Wall Matrix FS 636

Intermediate Side Wall Matrix FS 636

₸7,125-28,500
MK STR LLC 🇷🇺
Stainless Steel Support SM-F2, 200x100x44 mm, AISI 316L

Stainless Steel Support SM-F2, 200x100x44 mm, AISI 316L

₸4,275-14,250
SZ EMI OJSC 🇷🇺
Heavy-Duty M24 Bolt 1250mm Length

Heavy-Duty M24 Bolt 1250mm Length

₸2,280-7,125
IRZMK CJSC 🇷🇺
Double Reinforced Bracket for STRUT Profile

Double Reinforced Bracket for STRUT Profile

₸142.50-855
IEK Holding LLC 🇷🇺
Cover Plate for Trunking Lid 500 CLP1S-NK-500 IEK

Cover Plate for Trunking Lid 500 CLP1S-NK-500 IEK

₸427.50-1,710
IEK Holding LLC 🇷🇺
Cover Plate for Trench Lid 300 HDZ - CLP1S-NK-300-HDZ

Cover Plate for Trench Lid 300 HDZ - CLP1S-NK-300-HDZ

₸285-1,710
IEK Holding LLC 🇷🇺
Hinged Joint Plate for Tray Connection h 100 CLP1SH-100

Hinged Joint Plate for Tray Connection h 100 CLP1SH-100

₸427.50-1,710
IEK Holding LLC 🇷🇺
Metal Strap Anchor Clamp B 10 for Secure Fixation

Metal Strap Anchor Clamp B 10 for Secure Fixation

₸42.75-171
Niled LLC 🇷🇺
Reinforced Ceiling Mount for STRUT Profile EZ IEK CLM50D-KPS-81

Reinforced Ceiling Mount for STRUT Profile EZ IEK CLM50D-KPS-81

₸712.50-2,280
IEK Holding LLC 🇷🇺
Cable Ladder Transition Adapter for Up to 1000V Systems

Cable Ladder Transition Adapter for Up to 1000V Systems

₸142.50-1,140
IEK Holding LLC 🇷🇺
Double STRUT Console 41x41-600 CLM50D-CSD-41-41-06

Double STRUT Console 41x41-600 CLM50D-CSD-41-41-06

₸712.50-2,850
IEK Holding LLC 🇷🇺
Support Bracket BSO 40U-000 for Cable Tray Installation

Support Bracket BSO 40U-000 for Cable Tray Installation

₸1,425-8,550
SZ EMI OJSC 🇷🇺
Locking Fixture Mounting Plate 316000610519800

Locking Fixture Mounting Plate 316000610519800

₸142.50-1,140
UAZ LLC 🇷🇺
Ladder Tray 50x300x3000mm 1.5mm IEK HDZ

Ladder Tray 50x300x3000mm 1.5mm IEK HDZ

₸7,125-19,950
IEK Holding LLC 🇷🇺
Cable Protection Plate ONL LS 000x00 for OPL Series Trays

Cable Protection Plate ONL LS 000x00 for OPL Series Trays

₸427.50-2,850
SZ EMI OJSC 🇷🇺
Joint Connection Plate h 50 RAL CLP1SHR-050

Joint Connection Plate h 50 RAL CLP1SHR-050

₸142.50-855
IEK Holding LLC 🇷🇺
Self-Expanding Ground Anchor Basaltum DB-88

Self-Expanding Ground Anchor Basaltum DB-88

₸712.50-2,850
NPO BAZALTUM LLC 🇷🇺
Reinforced Console SMO 41x61x41x2.5D-000 for Cable Trays

Reinforced Console SMO 41x61x41x2.5D-000 for Cable Trays

₸4,275-17,100
SZ EMI OJSC 🇷🇺
High-Strength Bolt Sets for Pre-Tensioning - HR System

High-Strength Bolt Sets for Pre-Tensioning - HR System

₸427.50-2,850
MMK-METIZ OJSC 🇷🇺
LLK2-080-500 Ladder tray 80x500x3000, 1,5 mm

LLK2-080-500 Ladder tray 80x500x3000, 1,5 mm

₸7,125-19,950
IEK Holding LLC 🇷🇺
Reinforced Support Bracket BSOL 33-000

Reinforced Support Bracket BSOL 33-000

₸4,275-28,500
SZ EMI OJSC 🇷🇺
Double Bracket for STRUT Profile CLM50D-UDS-107-40

Double Bracket for STRUT Profile CLM50D-UDS-107-40

₸142.50-855
IEK Holding LLC 🇷🇺

FAQ

Can Russian plants manufacture fasteners to my drawings or to DIN and ISO standards?
Yes. Most factories in this section run CNC and cold-heading equipment and regularly produce against customer drawings or DIN, ISO and ANSI references alongside native GOST and OST series. You supply the drawing or standard number with material and coating requirements; the plant confirms feasibility, tooling cost if any, and a unit price tied to batch size.
What does material traceability look like for alloy-steel fasteners?
For structural and aviation-grade items, suppliers issue batch certificates referencing the steel grade, heat number and mechanical test results — tensile strength, hardness and, where required, impact toughness. This level of documentation matters for rail, energy and aerospace maintenance buyers, and it comes from the plant laboratory rather than a trading intermediary.
Are samples available before a production order?
Routinely, yes. For catalogue items, plants send sample packs by courier free or at cost. For drawing-based parts, a paid pilot batch of 50–200 pieces is the usual route: you verify fit and coating on your side, then release the serial order against the approved sample.
What are realistic lead times for mixed hardware orders?
Stock catalogue positions ship in 5–10 working days. Made-to-order brackets, plates and special fasteners typically need 20–40 days depending on heat treatment and coating queues. Distributors usually place consolidated quarterly orders so that long-lead items and stock lines arrive in one container.
Which corrosion protection options are offered?
Standard options are electro-zinc plating for indoor use, hot-dip galvanising for outdoor structural hardware, and zinc-flake or special coatings for higher salt-spray requirements. State the target service environment or the salt-spray hours you need, and the plant will recommend a coating with supporting test data.