Маҳсулот — Қазонҳо ва сӯзишгоҳҳо

Gas Burner Device for KSG/KSGV-10P LUCH with TGV307 Automation

Gas Burner Device for KSG/KSGV-10P LUCH with TGV307 Automation

сом. 981-3,270
TGA LLC 🇷🇺
Gas Burner Device for KSG/KSGV-16P LUCH with TGV307 Automation

Gas Burner Device for KSG/KSGV-16P LUCH with TGV307 Automation

сом. 981-3,270
TGA LLC 🇷🇺
Electric Water Heater KVE-30 for Boiling Water

Electric Water Heater KVE-30 for Boiling Water

сом. 1,635-5,232
TRADE MECHANICS LLC 🇷🇺
Electric Water Heater for Marine Use KЭВС-Р-80

Electric Water Heater for Marine Use KЭВС-Р-80

сом. 9,810-32,700
ONIIIP OJSC 🇷🇺
Solar Collector for Colored Materials "Sokol-Effect M

Solar Collector for Colored Materials "Sokol-Effect M

сом. 6,540-19,620
VPK "NPO Mashinostroeniya" OJSC 🇷🇺
Sectional Gas Burner, 2 Sections

Sectional Gas Burner, 2 Sections

сом. 163.50-654
PROGRESS BEHIN LLC 🇷🇺
Gas Burner Device for KSG-12, KSGV-12 LUCH with TGV-307 Automation

Gas Burner Device for KSG-12, KSGV-12 LUCH with TGV-307 Automation

сом. 981-3,270
TGA LLC 🇷🇺
Electric Disinfection Kettle KDEA1-4 Automatic Single Mode

Electric Disinfection Kettle KDEA1-4 Automatic Single Mode

сом. 981-3,270
DZMO OJSC 🇷🇺
Steam Water Heater PE 200 Capacity Model IUSH.D.065115.001

Steam Water Heater PE 200 Capacity Model IUSH.D.065115.001

сом. 9,810-39,240
VINETA LLC 🇷🇺
Efficient Gas Heating Boiler KOV-25SKVS ZHAR

Efficient Gas Heating Boiler KOV-25SKVS ZHAR

сом. 4,905-16,350
SIGNAL-HEATENGINEERING LLC 🇷🇺
Thermofakel 200 Gas Burner for High-Temperature Applications

Thermofakel 200 Gas Burner for High-Temperature Applications

сом. 9,810-32,700
VOLGATERM LLC 🇷🇺
Heating Energy Severosoleninskoye GKM for Heating Systems

Heating Energy Severosoleninskoye GKM for Heating Systems

сом. 654,000-13,080,000
NORILSKGAZPROM OJSC 🇷🇺
Hot Water Supply System for Heating and Water Supply - Yuzhno-Soleninsk GKM

Hot Water Supply System for Heating and Water Supply - Yuzhno-Soleninsk GKM

сом. 654,000-6,540,000
NORILSKGAZPROM OJSC 🇷🇺
Combined Gas Heating Unit AKGV-23.2E "Ochag

Combined Gas Heating Unit AKGV-23.2E "Ochag

сом. 4,578-11,990
SERVICEGAZ LLC 🇷🇺
Thermal Gas Heating Furnace PGT for Metal Parts Heating

Thermal Gas Heating Furnace PGT for Metal Parts Heating

сом. 327,000-2,616,000
NAKALPROM CJSC 🇷🇺
Combined Gas Unit AKGV-11.6E "Ochak

Combined Gas Unit AKGV-11.6E "Ochak

сом. 2,943-7,848
SERVICEGAZ LLC 🇷🇺
Individual Block Heat Points for Heating and Hot Water Supply - BITP

Individual Block Heat Points for Heating and Hot Water Supply - BITP

сом. 45,780-196,200
ADL Trading House LLC 🇷🇺
Gas Heating Appliance with Forced Circulation for Water Circuit, VilTerm A 14T

Gas Heating Appliance with Forced Circulation for Water Circuit, VilTerm A 14T

сом. 4,578-11,990
YUGENERGOPROM LLC 🇷🇺

Continuous Action Water Boiler KEND-100 Stainless Steel

сом. 16,350-65,400
FSIN IK-7 of the Republic of Bashkortostan 🇷🇺
Modular Gas-Diesel Burner HTLX2040 MG.MD.S.RU.A.8.100.EI

Modular Gas-Diesel Burner HTLX2040 MG.MD.S.RU.A.8.100.EI

сом. 163,500-654,000
Burner Equipment Plant LLC 🇷🇺
Gas Burner Device UG-SABK-AT-22.5-2

Gas Burner Device UG-SABK-AT-22.5-2

сом. 392.40-1,308
SERVICEGAZ LLC 🇷🇺
Regulating Electric Heating System "Regul" (R) (T1-T6)-(2-150)-(2-6) Ex e ll

Regulating Electric Heating System "Regul" (R) (T1-T6)-(2-150)-(2-6) Ex e ll

сом. 32,700-196,200
KST LLC 🇷🇺
Gas Heating Furnace PГН for Metal Heating

Gas Heating Furnace PГН for Metal Heating

сом. 981,000-3,924,000
Ural Federal University named after the First President of Russia B.N. Yeltsin 🇷🇺
Automated Heat Point "Vzlet ATP

Automated Heat Point "Vzlet ATP

сом. 98,100-392,400
Vzlet OJSC 🇷🇺
High-Efficiency Heat Generator TGV-2.2

High-Efficiency Heat Generator TGV-2.2

сом. 98,100-327,000
CSD AGRO LLC 🇷🇺
Steel Heating Boiler AOGV "Gazovik" Series AOGV-6

Steel Heating Boiler AOGV "Gazovik" Series AOGV-6

сом. 4,578-11,990
LEMAX LLC 🇷🇺
Energy-independent Gas Heating Boiler KOV-12.5SVPS ZHAR Compact

Energy-independent Gas Heating Boiler KOV-12.5SVPS ZHAR Compact

сом. 3,924-10,464
SIGNAL-HEATENGINEERING LLC 🇷🇺
Medium Pressure Gas Burner GGS-B-3.5, 3.5MW Heat Output

Medium Pressure Gas Burner GGS-B-3.5, 3.5MW Heat Output

сом. 16,350-52,320
PROGRESS LLC 🇷🇺
Modular Gas-Diesel Burner HRX2080 MG.MD.S.RU.A.8.125.EI

Modular Gas-Diesel Burner HRX2080 MG.MD.S.RU.A.8.125.EI

сом. 163,500-523,200
Burner Equipment Plant LLC 🇷🇺
Gas Burner Device UG-SABK-TR-29-3

Gas Burner Device UG-SABK-TR-29-3

сом. 981-3,270
SERVICEGAZ LLC 🇷🇺
Gas Burner Block GGS-B-2.2 for Efficient Natural Gas Combustion

Gas Burner Block GGS-B-2.2 for Efficient Natural Gas Combustion

сом. 9,810-32,700
YARANKY MECHANICAL PLANT OJSC 🇷🇺
Continuous Electric Water Boiler KEN-100

Continuous Electric Water Boiler KEN-100

сом. 4,578-16,350
CHUVASHTORGTECHNICA OJSC 🇷🇺
Infrared Gas Heating System IKNH-50-L-50 (L-Shaped)

Infrared Gas Heating System IKNH-50-L-50 (L-Shaped)

сом. 16,350-52,320
IEMZ Kupol OJSC 🇷🇺
Pelatkinskoye Heat Energy GKM for Heating and Hot Water Systems

Pelatkinskoye Heat Energy GKM for Heating and Hot Water Systems

сом. 654,000-6,540,000
NORILSKGAZPROM OJSC 🇷🇺
Gas Burner GKS-160 for Efficient Heating Solutions

Gas Burner GKS-160 for Efficient Heating Solutions

сом. 4,578-19,620
GZE LLC 🇷🇺
Low NOx Modular Gas Burner N925X M-.MD.LP.RU.A.8.65.EA

Low NOx Modular Gas Burner N925X M-.MD.LP.RU.A.8.65.EA

сом. 98,100-327,000
Burner Equipment Plant LLC 🇷🇺
Electric Water Boiling Device for Ship KEVS-R-30

Electric Water Boiling Device for Ship KEVS-R-30

сом. 4,905-16,350
ONIIIP OJSC 🇷🇺
Gas Burner Unit for KSG-8C LUCH with TGV-307 Automation (LPG)

Gas Burner Unit for KSG-8C LUCH with TGV-307 Automation (LPG)

сом. 392.40-1,635
TGA LLC 🇷🇺
AMAX-BG Gas Equipment Block for Boilers

AMAX-BG Gas Equipment Block for Boilers

сом. 9,810-65,400
AMAKS VALVE FACTORY LLC 🇷🇺
Energy-independent Floor Gas Heating Boiler KOV-12.5SKC ZHAR

Energy-independent Floor Gas Heating Boiler KOV-12.5SKC ZHAR

сом. 3,924-10,464
SIGNAL-HEATENGINEERING LLC 🇷🇺
Gas Burner for Liquefied Gas GIM-6

Gas Burner for Liquefied Gas GIM-6

сом. 32.70-196.20
Federal Penitentiary Service of the Republic of Mari El 🇷🇺
Block Heating Point SPL MS-HT (Heating/Ventilation System Module)

Block Heating Point SPL MS-HT (Heating/Ventilation System Module)

сом. 98,100-654,000
MEGATRON LLC 🇷🇺
Gas Burner Device UГ-САБК-Е-11.6-6

Gas Burner Device UГ-САБК-Е-11.6-6

сом. 457.80-1,635
SERVICEGAZ LLC 🇷🇺
Gas Burner Device with Automation TGV-307 for KSG-8C LUCH

Gas Burner Device with Automation TGV-307 for KSG-8C LUCH

сом. 392.40-1,635
TGA LLC 🇷🇺
Gas Burner Assembly with TGV-307 Automation for KSG-20, KSGV-20

Gas Burner Assembly with TGV-307 Automation for KSG-20, KSGV-20

сом. 981-3,270
TGA LLC 🇷🇺

FAQ

•Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
•Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
•What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
•How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
•Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.