产品 — 锅炉与燃烧器
Solar Collector for Colored Materials "Sokol-Effect M
¥4,320-12,960
VPK "NPO Mashinostroeniya" OJSC 🇷🇺
Hot Water Supply System for Heating and Water Supply - Yuzhno-Soleninsk GKM
¥432,000-4,320,000
NORILSKGAZPROM OJSC 🇷🇺
Individual Block Heat Points for Heating and Hot Water Supply - BITP
¥30,240-129,600
ADL Trading House LLC 🇷🇺
Gas Heating Appliance with Forced Circulation for Water Circuit, VilTerm A 14T
¥3,024-7,920
YUGENERGOPROM LLC 🇷🇺
Continuous Action Water Boiler KEND-100 Stainless Steel
¥10,800-43,200
FSIN IK-7 of the Republic of Bashkortostan 🇷🇺
Modular Gas-Diesel Burner HTLX2040 MG.MD.S.RU.A.8.100.EI
¥108,000-432,000
Burner Equipment Plant LLC 🇷🇺
Regulating Electric Heating System "Regul" (R) (T1-T6)-(2-150)-(2-6) Ex e ll
¥21,600-129,600
KST LLC 🇷🇺
Gas Heating Furnace PГН for Metal Heating
¥648,000-2,592,000
Ural Federal University named after the First President of Russia B.N. Yeltsin 🇷🇺
Energy-independent Gas Heating Boiler KOV-12.5SVPS ZHAR Compact
¥2,592-6,912
SIGNAL-HEATENGINEERING LLC 🇷🇺
Modular Gas-Diesel Burner HRX2080 MG.MD.S.RU.A.8.125.EI
¥108,000-345,600
Burner Equipment Plant LLC 🇷🇺
Gas Burner Block GGS-B-2.2 for Efficient Natural Gas Combustion
¥6,480-21,600
YARANKY MECHANICAL PLANT OJSC 🇷🇺
Pelatkinskoye Heat Energy GKM for Heating and Hot Water Systems
¥432,000-4,320,000
NORILSKGAZPROM OJSC 🇷🇺
Low NOx Modular Gas Burner N925X M-.MD.LP.RU.A.8.65.EA
¥64,800-216,000
Burner Equipment Plant LLC 🇷🇺
Energy-independent Floor Gas Heating Boiler KOV-12.5SKC ZHAR
¥2,592-6,912
SIGNAL-HEATENGINEERING LLC 🇷🇺
Gas Burner for Liquefied Gas GIM-6
¥21.60-129.60
Federal Penitentiary Service of the Republic of Mari El 🇷🇺
常见问题
•Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
•Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
•What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
•How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
•Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.