Товары — Электропитание и распределение

Electric Vehicle Charging Station "Alliance

Зарядная станция «Alliance»

₽2 500 000-4 000 000
PORTAL ENERGY LLC 🇷🇺
Flame Control Mounting Unit FDSA-03M 3M-01

Монтажный узел 3М-01

₽5 000-15 000
PROMA LLC 🇷🇺
Locomotive Terminal Box Cover PЦ 57.00.00

Крышка ПЦ 57.00.00

₽1 500-3 000
PCP LLC 🇷🇺
Integrated Security Control Cabinet "Dozor" SHOTV 78.20.00.001

Шкаф ШОТВ 78.20.00.001 "Дозор"

₽30 000-150 000
PIRAN IT LLC 🇷🇺
Control Cabinet for CNG Stations SHU 600

Шкаф управления АГНКС ШУ 600

₽350 000-700 000
SERVICE LLC 🇷🇺
Airport Rectifier for Ground Power Supply EAR-600

Аэродромный выпрямитель EAR-600

₽1 500 000-2 500 000
ELECTROAIR LLC 🇷🇺
Electric Actuated Shut-off Valve 1052-65-EM DN65/PN23.5

Вентиль запорный 1052-65-ЭМ DN65/PN23,5

₽150 000-250 000
Energomash (Chekhov) - CZEM OJSC 🇷🇺
Power Distribution Cabinet SHRS for Electrical Energy Management

Шкаф силовой распределительный

₽150 000-300 000
VIBRATOR OJSC 🇷🇺
Electric Actuated Shut-off Valve 998-20-EM DN20/PN37.3

Вентиль запорный 998-20-ЭМ DN20/PN37,3

₽150 000-250 000
Energomash (Chekhov) - CZEM OJSC 🇷🇺
Electric Actuated Shut-off Valve 1054-40-EM DN40/PN37.3

Вентиль запорный 1054-40-ЭМ DN40/PN37,3

₽150 000-250 000
Energomash (Chekhov) - CZEM OJSC 🇷🇺
Input Distribution Cabinet - ШВ Model for Power Supply Connection

ШВ - шкаф ввода

₽15 000-50 000
ENELT Production Company LLC 🇷🇺
Distribution Cabinet SHRU-D for Local Network Connections

Шкаф Распределительный ШРУД

₽75 000-150 000
VINTECH LLC 🇷🇺
Electric Actuator Control Cabinet SHUZ-R3

ШКАФ УПРАВЛЕНИЯ ЗАДВИЖКОЙ ШУЗ-R3

₽25 000-45 000
KB POZHARNOY AVTOMATIKI LLC 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.