Товары — Электропитание и распределение

Locomotive Indication Block BIL-IP-01 36905-210-00 for BLOCK-M System

Блок индикации локомотивный БИЛ-ИП-01 36905-210-00 комплекса БЛОК-М

₽15 000-30 000
Federal State Unitary Enterprise "Production Association "OKTYABR" 🇷🇺
KM42 Signal Transmission Cross-Module

Кросс-модуль КМ42

₽5 000-15 000
KOMPONENT-ASU OJSC 🇷🇺
Selector Block for Conference Systems BС VABM.465287.005

Блок селектора БС ВАБМ.465287.005

₽60 000-120 000
VENTUR-SERVICE LLC 🇷🇺
ZU-16M Charging Device for Bracelet-PRO Models

Зарядное устройство ЗУ-16М исп. Л

₽150 000-250 000
ARGUS-SPEKTR LLC 🇷🇺
Optical Fiber Connection Box for FTTH Networks - KORN-MD

Кросс КОРН-МД

₽15 000-25 000
VINTECH LLC 🇷🇺
Polymer Insulator for Outdoor Installation OCK 12.5-150-A05-3 UHL1

Изолятор ОСК 12,5-150-А05-3 УХЛ1

₽15 000-25 000
ENERGIYA + 21 OJSC 🇷🇺
Linear Suspension Insulator LK 70/20-2GP

Изолятор ЛК 70/20-2ГП

₽300-500
ENERGIYA + 21 OJSC 🇷🇺
Polymer Insulator with Silicone Rubber Coating for 35kV, Model OSK 8-35-B-3 UHL1

Изолятор ОСК 8-35-Б-3 УХЛ1

₽5 000-10 000
IZOLYATOR OJSC 🇷🇺
Polymer Insulator OCK 8-220-A05-3 UHL1

Изолятор ОСК 8-220-А05-3 УХЛ1

₽15 000-25 000
ENERGIYA + 21 OJSC 🇷🇺
High-Frequency Interference Suppressor VCHZ-2000-1.0

Высокочастотный заградитель ВЧЗ-2000-1,0

₽150 000-300 000
MULTIPROCESSING LLC 🇷🇺
High-Frequency Interference Suppressor VCHZ-2000-0.1

Высокочастотный заградитель ВЧЗ-2000-0,1

₽150 000-300 000
MULTIPROCESSING LLC 🇷🇺
Single-Phase Rectifier for Smooth Voltage Regulation 4500W

Выпрямитель В-ОПП-4500-1050-У2

₽500 000-1 000 000
ELECTRORECTIFIER PJSC 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.