Товары — Крепёж и метизы

UP1K-2 Support Element for Machinery - 667278.00004

Упор УП1К-2 667278.00004

₽15 000-30 000
АО "БЦЛ" 🇷🇺
Mounting Rail Type B 400 YKM40D-FO-VRB-040 IEK

YKM40D-FO-VRB-040 FORMAT Рейка монтажная тип В 400 IEK

₽200-500
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Ball Joint Elbow 3KSH 50x40

Колено шарнирное 3КШ 50х40

₽15 000-25 000
ООО "НПК" 🇷🇺
Base Cover for Tray CLP1S-PSOL-100

CLP1S-PSOL-100 Накладка на основание лотка 100

₽50-150
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Hollow Semi-Tubular Rivets OST 1 34006-78

Заклепки ОСТ 1 34006-78

₽5-20
ООО "АВИАСЕРВИС" 🇷🇺
Hydraulic Anchor Installation Tool OKS 0.2.3.114/168.516.01

ОКС 0.2.3.114/168.516.01 Инструмент установочный

₽15 000-30 000
ООО ППН "СИББУРМАШ" 🇷🇺
EA Welded Mounting for STRUT Profile

Крепление приварное EA для STRUT-профиля

₽50-150
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Base Cover for Tray 400 CLP1S-PSOL-400

CLP1S-PSOL-400 Накладка на основание лотка 400

₽150-300
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Joint Connection Plate h 80 CLP1SH-080

CLP1SH-080 Пластина шарнирного соединения h 80

₽150-300
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Flat-Rounded Head Bolt-Rivet Rods OСТ 1 30051-89

Стержни болт-заклепок ОСТ 1 30051-89

₽15-50
ООО "АВИАСЕРВИС" 🇷🇺
Single Angle Bracket for Cable Trays CLP1-UKO

CLP1-UKO Уголок крепежный одинарный

₽50-150
ООО "ИЭК ХОЛДИНГ" 🇷🇺
IP65 Mounting Kit for Safe Circuit Installation (TIS 34.1.3.90.000-01)

Комплект монтажный IP65 (ТИС 34.1.3.90.000-01)

₽15 000-30 000
ООО "УРАЛТЕХИС" 🇷🇺
Reinforced Console NKU EA

Консоль усиленная NKU EA

₽150-300
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Mounting Frame RU-M7 for SPM Series Connectors

Рамка установочная РУ-М7

₽250-500
АО "НПО "КАСКАД" 🇷🇺
Profile Connector for Metal Trays CLP1Z-CP-050-1

CLP1Z-CP-050-1 Соединитель профиля

₽150-300
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Base Cover for Tray CLP1S-PSOL-200

CLP1S-PSOL-200 Накладка на основание лотка 200

₽50-150
ООО "ИЭК ХОЛДИНГ" 🇷🇺
Base Cover for Tray 300 CLP1S-PSOL-300

CLP1S-PSOL-300 Накладка на основание лотка 300

₽150-300
ООО "ИЭК ХОЛДИНГ" 🇷🇺

Часто задаваемые вопросы

Can Russian plants manufacture fasteners to my drawings or to DIN and ISO standards?
Yes. Most factories in this section run CNC and cold-heading equipment and regularly produce against customer drawings or DIN, ISO and ANSI references alongside native GOST and OST series. You supply the drawing or standard number with material and coating requirements; the plant confirms feasibility, tooling cost if any, and a unit price tied to batch size.
What does material traceability look like for alloy-steel fasteners?
For structural and aviation-grade items, suppliers issue batch certificates referencing the steel grade, heat number and mechanical test results — tensile strength, hardness and, where required, impact toughness. This level of documentation matters for rail, energy and aerospace maintenance buyers, and it comes from the plant laboratory rather than a trading intermediary.
Are samples available before a production order?
Routinely, yes. For catalogue items, plants send sample packs by courier free or at cost. For drawing-based parts, a paid pilot batch of 50–200 pieces is the usual route: you verify fit and coating on your side, then release the serial order against the approved sample.
What are realistic lead times for mixed hardware orders?
Stock catalogue positions ship in 5–10 working days. Made-to-order brackets, plates and special fasteners typically need 20–40 days depending on heat treatment and coating queues. Distributors usually place consolidated quarterly orders so that long-lead items and stock lines arrive in one container.
Which corrosion protection options are offered?
Standard options are electro-zinc plating for indoor use, hot-dip galvanising for outdoor structural hardware, and zinc-flake or special coatings for higher salt-spray requirements. State the target service environment or the salt-spray hours you need, and the plant will recommend a coating with supporting test data.