
Water vapour turbine part T-250: high pressure cylinder assembly, medium pressure cylinder assembly, including valve stop.
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
-WDC and CSD-I complete with installation on the existing foundation and new front bearing block and thrust bearing housings;
-Blocks of valves VD and SD with actuators with double steam inlets for connection to steam lines of boiler drum TPP-210A;
-block of the front bearing, support bearing assembly and rear support liner CSD-I;
-foundation frames under the housings of the front bearing block and thrust bearing;
-equipment of the turbine with electrohydromechanical ATS and turbine protection;
-equipping the drive turbine of the PTH with an electromechanical system of automatic regulation and protection with replacement of the actuators of the stop and control valves
equipping the turbine with ASKVM;
-replacement of ejectors, EOCs, oil protection rings and turbine cladding.
Designation of the turbine after Modernisation: T-250/300-23,5 PR1.
Technical Specifications
Maximum scope of modernization | in addition to the medium variant, the low-pressure flow part is replaced; this allows to increase the reliability of the low-pressure part operation |
---|---|
Average volume of modernization | In addition to the replacement of high-pressure and medium-pressure cylinder resource units and parts; additionally includes the replacement of low-pressure flow section; and by-pass tubes from high-pressure cylinder to medium-pressure cylinder. |
Minimum scope of modernization | Modernisation of T-250 series turbine replace service life units and parts; operating at temperatures above 450°C. This allows to renew the service life; and also to increase the nominal; maximum power and heat load in condensing mode. |
Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.
Shipping & Payment Information
Shipping Terms
- FOB: Novorossiysk, Russia
- CIF: Available to major ports worldwide
- EXW: Manufacturer's facility, Russia
Delivery Time
- Sea freight: 30-60 days (depending on destination)
- Air freight: 14-21 days (for urgent orders)
- Production lead time: 30-90 days (depending on order size)
Payment Methods
- Letter of Credit (L/C)
- Wire Transfer (T/T)
- Escrow Services
Order Minimums
- We work with orders starting from 1 container
- You can mix different products in one container
- Volume discounts available for larger orders
Customs & Documentation Support
We provide comprehensive assistance with all export documentation, customs clearance, and logistics arrangements. Our team has extensive experience facilitating international trade with businesses in Africa, Middle East, Asia, and Latin America.
Contact Our Import Specialists
WhatsApp (Recommended)
For fastest response and immediate assistance with pricing, availability, and ordering.
+971 58 657 4796For detailed inquiries, documentation requests, and formal communications.
Send Email Inquiry info@tonzar.comRequest Call Back
Schedule a consultation with our import specialists at your convenience.
Business Hours
We're available to assist you during the following hours:
- Monday - Friday: 9:00 AM - 6:00 PM (GMT+4)
- Saturday: 10:00 AM - 2:00 PM (GMT+4)
- Sunday: Closed
Our WhatsApp support is available outside business hours for urgent inquiries.
Similar Products You May Be Interested In

High-pressure cylinder (HPC) with block of valves for steam turbine K-800-23,5-5MR of power unit No.1 "Nizhnevartovskaya GRES".
View Details
Diaphragm 23 stage 48T230-3277
View Details
CND rear seal KE16.139.02.000
View Details
Forefoot pad PS.100.313.00.000
View Details
Assemblies and parts for modernisation of steam heating turbine PT-60 with replacement of high-pressure cylinder (HPC) with incr
View Details
Special check valve KOS 200-1M4
View Details
Set of assemblies and parts for modernisation of CND K-210(215)-12,8 of power unit st. No. 7 of Primorskaya GRES
View Details
Water vapour turbine part: high pressure cylinder assembly including stop valve and control valves
View Details
Aperture 29 stage 47T230-3218
View Details
Guide ring PS200.1517298
View Details
Set of products for modernisation of steam turbine T-100
View Details
Medium pressure cylinder with SD valve block for steam turbine K-330-23,5-6MR of power unit No. 3 of Iriklinskaya GRES
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions