Timer processing device. Connection of 3 Jaquet DSF sensors. Without 12 V frequency generator (MIRage-NTMU-J-L)

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

The timer processing devices MIRage-NTMU-J-L are designed to measure the time characteristics of periodic pulse signals and generate a pulse sequence with variable pulse repetition rate at a given rate of change of pulse repetition rate. The number of measuring channels (IR) of periods is 3, the number of IR of pulse generation is 1. Data exchange is carried out via redundant Ethernet interface via UDP protocol. When configuring and controlling the operating modes of the device, the ModBus protocol add-on is used, and the transmission of the flow of measured period values takes place in direct RAW mode without requests. MIRage-NTMU-J-L devices are designed to create automated process control systems (APCS) in various industries.

Specifications

Mechanical design DIN rail mounting
Number of period measurement channels 3 pc
Interface type Ethernet 10/100BaseTX - 2 channels
Number of measuring channels for pulse generation 1 pc
Data transfer rate 100
Data exchange protocol Modbus TCP/UDP slave
Reference oscillator frequency 16
Relative frequency error of the reference oscillator in the operating temperature range 0.005 %
Galvanic insulation Individual
Overall dimensions 114x108x111 mm
Weight, not more 450 g
Wago terminal block, conductor cross-section up to 2.5 mm2
Operating temperature range -25...70 °C
Consumption current, max. 75 mA
External supply voltage (+/- 15%) 24 V

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.