Transformer voltage regulator RKT.02

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

Microprocessor-based transformer voltage regulator (RCT.02) is designed to control on-load tap-changer actuators during automatic regulation of transformer ratio of power transformers in order to stabilise voltage on substation busbars or at the consumer. RKT.02 allows to operate in two-channel mode for transformers with split winding.

Specifications

Number of interfaces RS-485/422/232 2 pc
Number of channels 2 pc
Power supply voltage 220 V
Installation of temporary control of tap changer switching cycle (TC) is installed From 1 to 20 with 1 s discretisation
Weight 3 kg
Guarantee under operating conditions 3 a
Power consumption, max. 5 W
Operating temperature range (to order) minus 40 to plus 60
Overall dimensions 260*234*55 mm
Power supply voltage V = 220 V, 130 240 V, 50 Hz
Control voltage setpoint Us from 85V to 120V nominal monitored voltage (Un) discretely in 0.1V.
Drive start-up temporary control setpoint (Tz) is set 0.1 to 5 with 0.1 s discretes
The time delay for issuing a second command is set as follows 10 to 180 s in 1 s
Time delay for the appearance of control commands is established 10 to 180 seconds in 1 s
Regulator blocking setpoint in case of controlled voltage disappearance or "voltage sags". 55 to 95V with 0.1V discretisation
Regulator lockout setpoint in the event of a sudden increase in the monitored voltage 105 to 125 V with 0.1 V discretisation
Setpoint for inhibiting the regulator when the transformer current exceeds the setpoint. 50 to 200% of nominal input current with 1% discretisation

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.