
Medium pressure cylinder (MPC) with SR valve block for steam turbine K-330-23,5-8MPR of power unit No.7 "Kostromskaya GRES".
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Technical Specifications
Absolute vapor pressure upstream of DDC stop valves | 3.66 MPa |
---|---|
Temperature of steam after superheating before DDC stop valves | 540 °C |
Pressure losses in the superheating path in relation to the pressure upstream of the DDC stop valves (from the pressure downstre | 11 % |
Feed water temperature after the last preheater | 274.2 °C |
Absolute pressure in the condenser (reference) | 3.6 |
Nominal (maximum) fresh steam flow rate | 275 |
Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.
Shipping & Payment Information
Shipping Terms
- FOB: Novorossiysk, Russia
- CIF: Available to major ports worldwide
- EXW: Manufacturer's facility, Russia
Delivery Time
- Sea freight: 30-60 days (depending on destination)
- Air freight: 14-21 days (for urgent orders)
- Production lead time: 30-90 days (depending on order size)
Payment Methods
- Letter of Credit (L/C)
- Wire Transfer (T/T)
- Escrow Services
Order Minimums
- We work with orders starting from 1 container
- You can mix different products in one container
- Volume discounts available for larger orders
Customs & Documentation Support
We provide comprehensive assistance with all export documentation, customs clearance, and logistics arrangements. Our team has extensive experience facilitating international trade with businesses in Africa, Middle East, Asia, and Latin America.
Contact Our Import Specialists
WhatsApp (Recommended)
For fastest response and immediate assistance with pricing, availability, and ordering.
+971 58 657 4796For detailed inquiries, documentation requests, and formal communications.
Send Email Inquiry info@tonzar.comRequest Call Back
Schedule a consultation with our import specialists at your convenience.
Business Hours
We're available to assist you during the following hours:
- Monday - Friday: 9:00 AM - 6:00 PM (GMT+4)
- Saturday: 10:00 AM - 2:00 PM (GMT+4)
- Sunday: Closed
Our WhatsApp support is available outside business hours for urgent inquiries.
Similar Products You May Be Interested In

Coupling PS 200.1411580
View Details
Medium pressure cylinder (MPC) with SR valve block for steam turbine K-800-23,5-5MR of power unit No.1 "Nizhnevartovskaya GRES".
View Details
Half coupling with fasteners PS.100.201.05.000
View Details
Front CND seal KE16.138.02.000
View Details
Special check valve KOS 200-1M4
View Details
Water vapour turbine part: high pressure cylinder assembly including stop valve and control valves
View Details
Guide ring PS.100.125.01.000
View Details
Guide ring PS200.1517298
View Details
Rotor of CND (drawing 48T230-3275SBR)
View Details
Set of assemblies and parts of steam turbine K-215-130-1M3 for modernisation of CND of unit No.9 "Primorskaya GRES".
View Details
Set of products for modernisation of steam turbine T-100
View Details
Medium pressure cylinder with SD valve block for steam turbine K-330-23,5-6MR of power unit No. 3 of Iriklinskaya GRES
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions