Маҳсулот — Автоматизатсияи саноатӣ
Object Controller Management Module Kit with Mounting Set and Basic Software S3
сом. 9,810-32,700
EXPERTSTROYPROEKT LLC 🇷🇺
YKV-PL-G-36-45-3-0 TITAN Панели ЛГ к ВРУ-Х ХХ.45.ХХ (H=300) (2шт/компл) IEK
сом. 16.35-65.40
IEK Holding LLC 🇷🇺
Power Control and Alarm System Left Side - PKC LB (MNN.C480M2pD/NF.360066.020)
сом. 22,890-91,560
MARINEK-NN LLC 🇷🇺
A2I-TK Controller for Automated Process Control
сом. 981-3,924
Automation, Measurements, Engineering LLC 🇷🇺
Устройства комплектные низковольтные распределения, управления, измерения, сигнализации ва муҳофизати АСУТП силсилаи АСУ (Шкаф системи п
сом. 98,100-392,400
Tyumen Pribor LLC 🇷🇺
Kontroller programmirovannyy ELSI-MKC. Modul protsessorniy TC 111 A8 100 2ETH TU 26.51.70-114-73742749-2024
сом. 9,810-32,700
Elesi PSA Plant LLC 🇷🇺
Control Cabinet for Point Drive (SHUSP-M) JIPS.426469.017-04
сом. 9,810-39,240
Research Institute of Precision Mechanics OJSC 🇷🇺
Remote Control Signal Output Module for Distributed Control Point (RKP-TU)
сом. 981-3,270
TSU LLC 🇷🇺
Kompleksai barqaror va texnikai vosital "PILON", ijro "Pilon-3"
сом. 327,000-1,308,000
CJSC "NPO "EIS" 🇷🇺
Контроллери барномоии логикӣ MKLogic200®. Контроллери саноатӣ MK201
сом. 4,905-19,620
NEFTEAVTOMATIKA OJSC 🇷🇺
Комплекси барномавии «ТЕКОН» барои идоракунии таҷҳизоти электрикӣ (ПТК «ТЕКОН» ЭТО)
сом. 327,000-2,616,000
TEKONGRUP OJSC 🇷🇺
Kontroller barqaror ЭЛСИ-МКC. Paneli kommunikatsionny TK 121 10 ТУ 26.51.70-114-73742749-2024
сом. 981-3,924
Elesi PSA Plant LLC 🇷🇺
FAQ
•Can Russian PLCs replace Western controllers in an existing plant?
Frequently yes, at the controller level: standard IEC 61131-3 programming, Modbus and OPC UA support, and familiar I/O module structures make migration a normal engineering task rather than a redesign. Vendors will review your existing signal list and program structure, then state what ports directly and what needs adaptation, before you commit.
•Is the programming software available in English?
Major vendors ship development environments with English interfaces and documentation; some smaller ones offer English manuals with Russian-language tooling. Confirm language support for the specific product line when requesting a quote, and ask for a trial licence — most vendors provide evaluation versions so your engineers test the workflow first.
•How is technical support delivered to buyers abroad?
Standard practice is remote: email and messenger support from the vendor's engineers, screen-sharing sessions for commissioning, and firmware updates by download. For larger projects, paid on-site commissioning visits are negotiable. Agree response times and a support contact in the contract — vendors here are used to supporting industrial customers directly.
•What about cybersecurity and update policies for SCADA systems?
Vendors document update channels and provide signed firmware; many systems are designed for isolated or air-gapped networks, reflecting Russian industrial practice. Ask for the security architecture description and update policy as part of the tender file, and verify compatibility with your national requirements for critical infrastructure software before deployment.
•Can I start with a pilot before committing to a plant-wide rollout?
Yes, and vendors encourage it. A typical pilot is one controller with representative I/O and the development environment, shipped by air courier within 2–3 weeks. Vendors usually support the pilot intensively, since it is their main path to winning the full project. Pilot pricing is often close to list, with project discounts applied at rollout.