Омехтакунандагони автобет
Асфальтоукладчики
Кранҳои бурҷӣ бо иқтидори
Бетоносмесители
Бульдозеры
Виброплиты
Газораспределительные стансияҳои
Дорожно-сохтмонӣ мошинҳо
Қисмҳои эҳтиетии техникаи сохтмонӣ
Катиҳои роҳӣ
Кранҳои-трубоукладчики
Окрасочные камера
Дигар чизҳо
Иншоотҳои тозакунандаи
Таҷҳизоти истеҳсолӣ
Сваебойное таҷҳизоти
Дастгоҳҳо барои таъмири ямочного
Цементировочные агрегатҳои
Маҳсулот — Сохтмонии техника (вазнин)
9057235 Heavy-Duty Earthmoving Blade for Construction Equipment
сом. 32,700-196,200
Liebherr-Nizhny Novgorod LLC 🇷🇺
D20.0100 Bulldozer with YMZ Engine - Heavy-Duty Construction Machinery
сом. 981,000-3,270,000
SDM LLC 🇷🇺
D15.0100 Bulldozer with YAMZ Engine Configuration for Heavy-Duty Applications
сом. 981,000-3,270,000
SDM LLC 🇷🇺
D9.0102 Bulldozer with YAMZ Engines - Heavy-Duty Construction Equipment
сом. 1,635,000-4,578,000
SDM LLC 🇷🇺
Tooth Ripper 11425046 for Crawler Bulldozer Earthworks
сом. 981-3,924
Liebherr-Nizhny Novgorod LLC 🇷🇺
Tow Bar 10304720 for Crawler Bulldozer Ripper Attachment
сом. 9,810-39,240
Liebherr-Nizhny Novgorod LLC 🇷🇺
D14-I Bulldozer with YAMZ Engines for Earth Moving and Grading
сом. 981,000-3,270,000
DST-URAL LLC 🇷🇺
Electric Bridge Crane Structure for Reactor Room Applications
сом. 981,000-6,540,000
TYAZHMASH OJSC 🇷🇺
Chetra T-40.01K Crawler Tractor Heavy-Duty Bulldozer for Mining
сом. 1,962,000-5,886,000
PROMTTRACTOR LLC 🇷🇺
Crawler Tractor CHETRA T-9.01WBR-3 Heavy Duty Earthmoving Equipment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Crawler Bulldozer CHETRA T-9.01WBR-1 Heavy-Duty Equipment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Asphalt Paver Track Left Side 42 Links 560mm Shoe Tt-MZ-50-22-1-17LSP
сом. 9,810-32,700
BLOCK OJSC 🇷🇺
Asphalt Pothole Repair Installation with Cubic Gravel and Emulsion
сом. 163,500-523,200
Bastion LLC 🇷🇺
Bastion UYAR Asphalt Repair Unit Local Thermal Regeneration System
сом. 98,100-327,000
Bastion LLC 🇷🇺
Asphalt Concrete Paving Equipment Bastion LA-01 for Vehicle Mounting
сом. 32,700-104,640
Bastion LLC 🇷🇺
MSDH1-3500-001 Diesel Pile Driver Hammer 3500kg Impact Tool
сом. 163,500-457,800
Pile Driving Equipment Plant LLC 🇷🇺
MSDH1-2500-001 Diesel Impact Hammer for Piling Applications
сом. 457,800-1,308,000
Pile Driving Equipment Plant LLC 🇷🇺
MCSM-800H Multi-Purpose Construction Loader Heavy-Duty Equipment
сом. 98,100-327,000
CENTRDOM LLC 🇷🇺
KTC-HAMMER Hydraulic Crawler Pile Driving Rig for Road Construction
сом. 261,600-784,800
KTC METALLKONSTRUKTSIYA OJSC 🇷🇺
Liebherr Dump Truck Chassis Frame Model 12936296 Heavy-Duty Construction
сом. 98,100-392,400
Liebherr-Nizhny Novgorod LLC 🇷🇺
Crawler Bulldozer CHETRA T-9.01KB-1 Heavy-Duty Equipment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Crawler Bulldozer CHETRA T-9.01K Heavy-Duty Construction Equipment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Crawler Bulldozer CHETRA T-35.01KB-1 Heavy-Duty Earthmoving Equipment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Crawler Bulldozer Chetra T-20.01YABR-2-01 Heavy Duty Earthmoving Equipment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Crawler Bulldozer CHETRA T-11.02KMBR-3 Heavy-Duty Construction Equipment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Chetra T-11.01K1SB-1 Crawler Bulldozer Construction Machinery
сом. 981,000-3,270,000
PROMTTRACTOR LLC 🇷🇺
Chetra T-40.01KBR-2 Crawler Tractor Heavy-Duty Earth Moving Machine
сом. 2,289,000-6,540,000
PROMTTRACTOR LLC 🇷🇺
Chetra T-40.01KBR-1 Crawler Tractor Heavy-Duty Bulldozer
сом. 2,289,000-6,540,000
PROMTTRACTOR LLC 🇷🇺
Crawler Tractor CHETRA T-35.01K Heavy-Duty Bulldozer for Excavation
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Crawler Tractor CHETRA T-20.01YAB-1 with Bulldozer Attachment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Crawler Tractor CHETRA T-20.01Y with Bulldozer Attachment
сом. 1,635,000-4,578,000
PROMTTRACTOR LLC 🇷🇺
Chetra T-11.02K Crawler Tractor for Heavy-duty Applications
сом. 981,000-3,270,000
PROMTTRACTOR LLC 🇷🇺
FAQ
•How do I get spare parts after the machine arrives?
Agree a recommended spares kit with the factory at purchase — typically filters, wear plates, hoses and undercarriage items sized for 1,000–2,000 motohours. Afterwards, parts ship by air or groupage freight against the machine serial number. Many buyers keep a 5–10 percent of machine value in parts stock, which covers the first two seasons.
•Are these machines adapted for hot and dusty climates?
Yes, tropical versions are standard order options: upgraded cooling packages, pre-cleaners and cyclone air filters, and cabin air conditioning. Russian machines already tolerate wide temperature ranges by design, but state your ambient maximum and altitude in the request so the plant fits the correct radiator and fan configuration.
•What does shipping a bulldozer or roller actually cost and how is it done?
Smaller rollers and compactors travel in open-top or flat-rack containers; bulldozers and pavers usually go RoRo from Novorossiysk or St. Petersburg, sometimes partially disassembled with the blade and cab shipped separately. Sea freight to the Gulf or East Africa typically takes 25–45 days. Suppliers prepare the machine for marine transport, including preservation and lashing points.
•Is operator training or commissioning support included?
Commissioning supervision is normally a paid option: a factory engineer attends startup, verifies assembly and trains your operators over 3–7 days. For simpler machines, plants provide English-language manuals, video instructions and remote support instead. Write the support package into the contract rather than assuming it.
•What payment terms do machinery plants accept?
The common pattern is an advance of 30–50 percent with the balance before shipment, paid by bank transfer. Letters of credit are accepted by larger plants, though confirming banks should be discussed early given current banking routes. For repeat buyers, partial deferral against delivery documents is sometimes negotiable.
•Do cementing units and treatment plants come with engineering support?
Yes. Oilfield cementing units and packaged wastewater plants are engineered products, so suppliers provide process calculations, foundation and utility connection drawings, and supervised commissioning. For treatment plants, you submit inflow volume and contamination data first; the plant then sizes the unit and guarantees outlet parameters in the contract.