Дигар
Локерҳо ва ҷевонҳои либосивазкунӣ
Курсиҳои зал ва тамошобинон
Ҷевонҳои абонентӣ
Дастгоҳҳои интизорӣ
Курсиҳои интизорӣ
Ҷевонҳои матбуот
Мебели нарм барои интизорӣ
Курсиҳои секционӣ ва пӯшидашаванда
Стендҳо ва монеаҳо
Стеллажҳои китобхона
Овезаҳои фарш ва девор
Витринаҳои намоиш
Стендҳои иттилоотӣ
Кабинаҳои интихобот ва касса
Курсии варзишӣ ва ринг
Минбару кафедраҳо
Дастгоҳҳои хореографӣ
Маҳсулот — Мебели ҷойҳои ҷамъиятӣ
Library Checkout Desk for Librarians and Administrators
сом. 1,635-9,156
Rainbow-Lik With You LLC 🇷🇺
Bremen Transformer Chair, Size 540x700x1000 mm, Cushion Thickness 150 mm
сом. 981-3,270
BLOCK OJSC 🇷🇺
Versailles Book Armchair - 525x650x980mm with 110mm Cushion Thickness
сом. 523.20-1,962
LIMAR LLC 🇷🇺
High Stand with Two Cable Openings 8507 from "Galant Waiting Zone" Series
сом. 981-3,270
MEBEL COMFORT LLC 🇷🇺
Beijing Metal Frame Chair, Size: 540x640/720x1000, Cushion Thickness: 140 mm
сом. 654-3,270
BLOCK OJSC 🇷🇺
FAQ
•Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
•Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
•How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
•What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
•Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.