Дигар
Локерҳо ва ҷевонҳои либосивазкунӣ
Курсиҳои зал ва тамошобинон
Ҷевонҳои абонентӣ
Дастгоҳҳои интизорӣ
Курсиҳои интизорӣ
Ҷевонҳои матбуот
Мебели нарм барои интизорӣ
Курсиҳои секционӣ ва пӯшидашаванда
Стендҳо ва монеаҳо
Стеллажҳои китобхона
Овезаҳои фарш ва девор
Витринаҳои намоиш
Стендҳои иттилоотӣ
Кабинаҳои интихобот ва касса
Курсии варзишӣ ва ринг
Минбару кафедраҳо
Дастгоҳҳои хореографӣ
Маҳсулот — Мебели ҷойҳои ҷамъиятӣ
Theater Chair, Model "Teatr", Size 530x530/700x970, Cushion Thickness 110mm
сом. 981-3,270
LIMAR LLC 🇷🇺
Corner Stand 8511 with Cable Hole - "Galant Waiting Zone" Series
сом. 457.80-1,635
MEBEL COMFORT LLC 🇷🇺
Bremen Kino Public Space Armchair, 535*720*1000 mm, 150 mm Cushion Thickness
сом. 981-3,270
LIMAR LLC 🇷🇺
Metal Frame Chair for Auditoriums, Salavat Brand, Size: 540×425/650×940 mm
сом. 981-3,270
BLOCK OJSC 🇷🇺
Rio Kino Public Seating Chair, 540*740*915 mm, 110 mm Cushion Thickness
сом. 981-3,270
BLOCK OJSC 🇷🇺
Public Space Armchair "Dresden" 530*690*980 mm, Cushion Thickness 60 mm
сом. 981-3,270
BLOCK OJSC 🇷🇺
Metal Lockers for Clothing Storage, 4-Door, 1200x470x1725mm
сом. 1,635-4,578
IK-3 Correctional Colony, Federal Penitentiary Service of the Tambov Region 🇷🇺
Audience Chair, Model "Alpha", Size 540*720*1000 mm, Cushion Thickness 140 mm
сом. 981-3,270
BLOCK OJSC 🇷🇺
FAQ
•Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
•Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
•How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
•What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
•Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.