Товары — Электропитание и распределение

Mobile Autonomous Electric Socket EnergyBox LUX-1000

Мобильная автономная электрическая розетка EnergyBox LUX-1000

₽60 000-100 000
ООО "ТЕХНОЛОГИИ БУДУЩЕГО" 🇷🇺
High Voltage Connector SHU-206V

Разъём ШУ-206В

₽5 000-15 000
ООО "ГРАВИТОН" 🇷🇺
Mobile Autonomous Electric Socket EnergyBox LUX-1500

Мобильная автономная электрическая розетка EnergyBox LUX-1500

₽75 000-120 000
ООО "ТЕХНОЛОГИИ БУДУЩЕГО" 🇷🇺
Mobile Autonomous Electric Socket EnergyBox ECO-1000UPS

Мобильная автономная электрическая розетка EnergyBox ECO-1000UPS

₽35 000-50 000
ООО "ТЕХНОЛОГИИ БУДУЩЕГО" 🇷🇺
Portable Charging Socket KZET-S-CC2-DC250A

Розетка переносная КЗЭТ-S-CC2-DC250A

₽150 000-300 000
ООО "СОЕДИНИТЕЛЬ-ЭЛЕКТРО" 🇷🇺
SHU-205B Plug for Rail Transport Electrical Connections

Штепсель ШУ-205Б

₽15 000-25 000
ООО "ГРАВИТОН" 🇷🇺
BRP-16 Power Distribution Unit SAMP.468261.002

Блок БРП-16 САМП.468261.002

₽25 000-45 000
ООО "СИРИУС" 🇷🇺
Trombon BP-21 Backup Power Supply Unit

Блок резервного питания «Тромбон БП-21»

₽45 000-65 000
ООО "СОУЭ "ТРОМБОН" 🇷🇺
ExOnSys Operational DC Systems for Efficient Power Management

Системы оперативного постоянного тока "ExOnSys"

₽1 500 000-5 000 000
АО "ЭЛЕКТРОНМАШ" 🇷🇺
Constant Current Operational System SOPT-SESH

Система оперативного постоянного тока типа СОПТ-СЭЩ

₽500 000-1 500 000
АО "ГК "ЭЛЕКТРОЩИТ" - ТМ САМАРА" 🇷🇺
DC Power Supply Systems for Category I Consumers

Системы постоянного тока

₽500 000-1 500 000
ООО "ЧЭТА" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.