Товары — Электропитание и распределение

Adjustable Battery Charger/Discharger ZU-2-2 (ZR)

Устройство зарядное/разрядное ЗУ-2-2(ЗР)

₽60 000-120 000
ООО "КОМЕТА-С" 🇷🇺
Adjustable Charging/Discharging Device ZU-2-6B (ZR)

Устройство зарядное/разрядное ЗУ-2-6Б(ЗР)

₽150 000-250 000
ООО "КОМЕТА-С" 🇷🇺
ZU-2-6A Battery Charger for Fast Charging Needs

Зарядное устройство ЗУ-2-6А

₽50 000-150 000
ООО "КОМЕТА-С" 🇷🇺
ZU-2-4A Battery Charger for Efficient Charging

Зарядное устройство ЗУ-2-4А

₽30 000-60 000
ООО "КОМЕТА-С" 🇷🇺
Voltage Converter IDPP-57V

Преобразователь напряжения ИДПП-57В

₽15 000-25 000
ОАО "СЭЗ им. Серго Орджоникидзе" 🇷🇺
Voltage Converter PNBA33-4/115/400-A for Ground Support

Преобразователь напряжения ПНБА33-4/115/400-А

₽250 000-400 000
ООО "НТЦ АКТОР" 🇷🇺
Adjustable Charging/Discharging Device ZU-2-2B(ZR)

Устройство зарядное/разрядное ЗУ-2-2Б(ЗР)

₽75 000-150 000
ООО "КОМЕТА-С" 🇷🇺
Adjustable Voltage Converter PNBA33-4/300/1200-KR

Преобразователь напряжения ПНБА33-4/300/1200-КР

₽150 000-300 000
ООО "НТЦ АКТОР" 🇷🇺
Voltage Converter PNBA33-8/115/400-A for Ground Support

Преобразователь напряжения ПНБА33-8/115/400-А

₽300 000-500 000
ООО "НТЦ АКТОР" 🇷🇺
Autonomous Power Source AIP-2800

Автономный источник питания АИП-2800

₽15 000 000-25 000 000
ПАО "ГАЗПРОМ АВТОМАТИЗАЦИЯ" 🇷🇺
M-TPP-3600M-1-U2 Converter Technical Condition IEAL.435511.051

Преобразователь М-ТПП-3600М-1-У2 ТУ 16-2007 ИЕАЛ.435511.051

₽15 000 000-25 000 000
ООО "ЭЛЕКТРОВЫПРЯМИТЕЛЬ-СПК" 🇷🇺
Inverter for Industrial Power Supply - I-PTPT

Инвертор И-ПТПТ

₽1 500 000-2 500 000
АО "ЗАВОД "ИНВЕРТОР" 🇷🇺
Adjustable Charging/Discharging Device ZU-2-4B (ZR)

Устройство зарядное/разрядное ЗУ-2-4Б(ЗР)

₽150 000-250 000
ООО "КОМЕТА-С" 🇷🇺
Voltage Converter 9С831.000 for 1K214 Devices

9С831.000 Преобразователь напряжения

₽15 000-30 000
АО "НПО "ЭЛЕКТРОМАШИНА" 🇷🇺
Power Converter PNR-250-3 for Electric and Hybrid Vehicles

Преобразователь электроэнергии ПНР-250-3

₽150 000-250 000
ООО НПФ "АРС ТЕРМ" 🇷🇺

Часто задаваемые вопросы

Can distribution transformers be built for my national grid parameters?
Yes. Plants wind to your primary and secondary voltages, vector group, tap range and frequency, and apply the cooling and climatic execution your site needs. Provide the network one-line data and ambient conditions; the factory returns a technical proposal with losses, impedance and dimensions for approval before production, which typically takes 8–16 weeks.
What testing documentation accompanies a transformer?
Every unit passes routine tests — winding resistance, ratio, insulation, applied and induced voltage, losses — documented in a protocol shipped with the transformer. Type test reports for the design are available for tender files. Utility buyers can witness factory acceptance in person or by video link, which suppliers arrange routinely.
How are lithium batteries and UPS systems shipped internationally?
Lithium-ion batteries travel as Class 9 dangerous goods: UN-certified packaging, state-of-charge limits and dangerous goods declarations, which suppliers prepare. Sea freight is the standard mode; air carries tighter restrictions. Lead-acid and VRLA batteries ship with simpler paperwork. Factor 1–2 extra weeks for DG documentation on first orders.
Do UPS suppliers help size the system for my facility?
Yes — send the load list, required autonomy and site temperature, and the supplier proposes UPS rating, battery configuration and ventilation requirements. For data-centre and telecom projects, redundancy schemes and monitoring integration are specified at this stage. Sizing calculations are part of the quotation, not a paid extra.
Is commissioning support available for packaged substations?
Packaged substations ship factory-assembled and tested, with installation and earthing drawings. Supervised commissioning by a factory engineer is a contract option many utility buyers take for the first units, then handle subsequent ones with their own crews. Remote support and spare-parts kits are agreed in the supply contract.
What payment structure is usual for large electrical equipment?
Typical terms are 30–50 percent advance with the balance before shipment by bank transfer; letters of credit are workable with larger plants if banking channels are agreed early. For framework utility contracts, milestone payments tied to factory acceptance tests are common practice.