Товары — Котлы, горелки и водогрейные системы

Fast Sand Filter for Drinking Water Purification (FRPS)

Фильтр скорый песочный (ФРПС)

₽150 000-300 000
KOROLAN LLC 🇷🇺
Wall-Mounted Kitchen Exhaust Hood ZVPk Series

Зонт вытяжной пристенный серии ЗВПк

₽35 000-70 000
TECHNOLOGIES OF THE SOUTH LLC 🇷🇺
TDU Distribution Control Units for Horizontal Heating Systems

Узлы регулирования TDU

₽25 000-70 000
RIDAN LLC 🇷🇺
VA Type Stand for Combi Ovens and Equipment

Подставка тип ВА

₽25 000-70 000
SPECMASH LLC 🇷🇺
Gas Stove PRG-IIA-8-1 2DSh "Maxi

Газовая плита ПРГ-IIA-8-1 2ДШ «Maxi»

₽350 000-500 000
KELER RUS LLC 🇷🇺
Heating Block TB-3.2MA for Drying Applications

Топочный блок ТБ-3,2МА

₽250 000-400 000
AGROPROMTECHNICA CJSC 🇷🇺
Stainless Steel Cleaning Sink VMC-C

Ванна моечная ВМЦ-С

₽15 000-45 000
Food Machinery Plant LLC 🇷🇺
Dish Collection Trolley for Catering and Retail

Тележка для сбора посуды

₽15 000-30 000
BLOCK OJSC 🇷🇺
TSHG-8 Spindle Trolley for Food Service Operations

Тележка-шпилька ТШГ-8

₽25 000-45 000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Stainless Steel Washing Sink VSM-3

Ванна моечная ВСМ-3

₽35 000-55 000
BLOCK OJSC 🇷🇺
KC 111-2A Armor Plate Position 5 Heavy-Duty Protection

Броня КЦ 111-2А (поз.5)

₽500-1 500
CORVET-2000 CJSC 🇷🇺

Часто задаваемые вопросы

Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.