Товары — Котлы, горелки и водогрейные системы

Versatile Thermal Radiators T 230-200

Термоизлучатели Т 230-200

₽150-300
LISMA LLC 🇷🇺
Pizza Oven Stand PP-6 for Electric Pizza Oven PEП-6

Подставка ПП-6

₽15 000-25 000
CHUVASHTORGTECHNICA OJSC 🇷🇺
Gas-Fired Air Heating Unit AVGМ for Heating and Ventilation

Агрегат воздухонагревательный АВГМ

₽2 500 000-5 000 000
LLC NPF "TEPLOENERGOPROM" 🇷🇺
Thermal Emitters T 220-230-300-2

Термоизлучатели Т 220-230-300-2

₽200-500
LISMA LLC 🇷🇺
Thermal Gas Heating Furnace PGT for Metal Treatment

Печь с газовым нагревом термическая, тип ПГТ

₽3 000 000-20 000 000
CJSC NAKAL-INDUSTRIAL FURNACES 🇷🇺
Gas Heating Oven, THM-PP Series

Печь с газовым нагревом, серии ТХМ-ПП

₽15 000 000-30 000 000
TXM-PROMPEC' OJSC 🇷🇺
Lavart Pult Control Cabinet for Heating Boilers

Шкаф управления «Lavart Pult»

₽25 000-50 000
OMZIT CJSC 🇷🇺
Lavart K Control Cabinet for Hot Water Boilers

Шкаф управления "LAVART К"

₽70 000-150 000
OMZIT CJSC 🇷🇺
Heating Block TB-1.6PA for Drying Applications

Топочный блок ТБ-1,6ПА

₽250 000-400 000
AGROPROMTECHNICA CJSC 🇷🇺
Compact Regulating Unit VECTOR

Узел регулирующий ВЕКТОР

₽25 000-75 000
VEZA LLC 🇷🇺
Nord 16 Drying Stand for Shoes

Стойка сушильная Норд 16

₽35 000-55 000
NPOMET LLC 🇷🇺
High-Pressure Heater PВ-350-230-50-1

Подогреватель высокого давления ПВ-350-230-50-1

₽7 000 000-12 000 000
PJSC Krasny Kotelshchik 🇷🇺

Часто задаваемые вопросы

Can burners be configured for our local fuel quality?
Yes — fuel adaptation is a standard engineering request. Provide your gas pressure range or diesel specification and the factory selects jets, pumps and control settings accordingly. Dual-fuel burners that switch between gas and liquid fuel are widely produced and popular in markets with unstable gas supply.
Who performs commissioning of a boiler or heat substation?
Smaller boilers are commissioned by your local heating contractor using the supplied manuals and schematics. For industrial boilers and packaged substations, manufacturers typically offer supervised commissioning: either a factory engineer travels to site for an agreed fee, or commissioning is guided remotely with a checklist and video support.
What documentation is provided for project approval?
Standard sets include the technical passport, EAC declaration, hydraulic test certificate, burner adjustment records, and installation and operation manuals. For tender projects, suppliers can additionally provide dimensional drawings, electrical schematics and efficiency data sheets in English.
How long does manufacturing and delivery take?
Catalogue burners and wall boilers often ship from stock within 2 to 3 weeks. Floor-standing industrial boilers and packaged heat substations are built to order, typically in 45 to 90 days depending on capacity, plus sea or overland transit. Trucking to Central Asia is usually faster than sea routes.
Are spare parts a risk with imported boilers?
Boiler plants address this with recommended two-year spare kits — gaskets, electrodes, sensors, control boards — shipped with the equipment. Most wear parts are standardised, and consumables such as nozzles and ignition electrodes are also available from third-party suppliers, which reduces dependence on a single source.