Stop and regulating valve (tap), Type RJIP BaBV, Modification 3 PN25 DN50

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

The RJIP BaBV3 shut-off and regulating valve is designed to optimise the distribution of the flow of
The RJIP BaBV3 shut-off and control valve is designed to optimise the distribution of medium flows between the heat consumption systems within the ITP or CHPP, as well as for complete shut-off of the pipeline in case of need.
closing of the pipeline in case of necessity
It is allowed to install the equipment at hazardous production facilities, if the technical characteristics correspond to those specified in the passport.
characteristics correspond to those specified in the passport for this product.

Specifications

Weight 7.61 kg
Housing material Steel 20
Stem material stainless steel
Nominal diameter (DN) SBVVBG mm
Flow capacity kvs 41
Seal tightness Class A according to GOST 9544-2005
Nominal pressure (PN) 25
Recommended differential pressure across the valve max. ?P 1
Transported medium Water prepared for heating systems, water-glycol solutions up to 50%
Pipeline connections Flanged (FF)
Char stainless steel
Ball seal PTFE reinforced with carbon fiber
Gland seal EPDM
Temperature of the transported medium -20...150 °C
PH environment 7...10

Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.

Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.