
Set of blades for GTE-170.1 turbine (including: guide blades of 1,2,3,4 stages, working blades of 1,2,3,4 stages) for
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Technical Specifications
Gas temperature before 1st stage guide vane | 1171.25 °C |
---|---|
Total gas pressure upstream of the 1 stage guide vane | 1109610 |
Gas temperature in front of the 1st stage guide vane | 1112.34 °C |
Total gas pressure upstream of 1st stage guide vane | 1056970 |
Gas temperature before 2nd stage guide vane | 952.83 °C |
Total gas pressure upstream of 2nd stage guide vane | 705045 |
Gas temperature in front of 2nd stage guide vane 3229593:Gas temperature in front of 2nd stage guide vane | 932.57 °C |
Total gas pressure upstream of the 2nd stage working vane | 566194 |
Gas temperature before 3rd stage guide vane | 811.15 °C |
Total gas pressure upstream of the 3 stage guide vane | 417063 |
Gas temperature in front of the 3rd stage working blade 3229597:Gas temperature in front of the 3rd stage working blade | 801.03 °C |
Total gas pressure upstream of the 3-stage impeller | 341622 |
Gas temperature in front of the guide vane of stage 4 | 678.78 °C |
Total gas pressure before 4th stage guide vane | 255232 |
Gas temperature in front of the 4th stage impeller | 675.54 °C |
Total gas pressure upstream of the 4 stage impeller | 197126 |
Temperature of gas behind the working blade of the 4th stage | 536.93 °C |
Total gas pressure behind the 4-stage impeller | 100777 |
Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.
Shipping & Payment Information
Shipping Terms
- FOB: Novorossiysk, Russia
- CIF: Available to major ports worldwide
- EXW: Manufacturer's facility, Russia
Delivery Time
- Sea freight: 30-60 days (depending on destination)
- Air freight: 14-21 days (for urgent orders)
- Production lead time: 30-90 days (depending on order size)
Payment Methods
- Letter of Credit (L/C)
- Wire Transfer (T/T)
- Escrow Services
Order Minimums
- We work with orders starting from 1 container
- You can mix different products in one container
- Volume discounts available for larger orders
Customs & Documentation Support
We provide comprehensive assistance with all export documentation, customs clearance, and logistics arrangements. Our team has extensive experience facilitating international trade with businesses in Africa, Middle East, Asia, and Latin America.
Contact Our Import Specialists
WhatsApp (Recommended)
For fastest response and immediate assistance with pricing, availability, and ordering.
+971 58 657 4796For detailed inquiries, documentation requests, and formal communications.
Send Email Inquiry info@tonzar.comRequest Call Back
Schedule a consultation with our import specialists at your convenience.
Business Hours
We're available to assist you during the following hours:
- Monday - Friday: 9:00 AM - 6:00 PM (GMT+4)
- Saturday: 10:00 AM - 2:00 PM (GMT+4)
- Sunday: Closed
Our WhatsApp support is available outside business hours for urgent inquiries.
Similar Products You May Be Interested In

Compressor outlet housing inner casing with machined finish 119E4019G003
View Details
Combustion chamber PST GTC-10IR PST5.387500.000
View Details
Combustion chamber ignition system of GTN-16M-1
View Details
Board for connecting device RS 491
View Details
Hub of wind power plant (hub of wind power plant)
View Details
Combustion chamber PST GTK-10-4 PST1.387500.000
View Details
Low-emission combustion module MS 3002 PST+ PST8.387.500.000
View Details
Wind turbine gondola
View Details
Combustion chamber PST GT-750-6 PST3.387500.000
View Details
Combustion chamber PST GTC-25IR PST6.387500.000
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions