
High pressure cylinder (HPC) with block of valves for steam turbine K-330-23,5-6MR of power unit No.5 "Kostromskaya GRES".
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Available Models
Technical Specifications
Nominal (maximum) fresh steam flow rate | 275 |
---|---|
Steam temperature behind the CVD | 287.6 °C |
Pressure losses in the superheating path in relation to the pressure upstream of the DDC stop valves (from the pressure downstre | 11 % |
Absolute vapor pressure behind CVD | 4.06 MPa |
Temperature of fresh steam upstream of CVD stop valves | 540 °C |
Absolute pressure of fresh steam upstream of stop valves of CVD | 23.54 MPa |
Note: All specifications are provided by the manufacturer and may be subject to change. Please contact us to confirm the latest specifications before placing your order.
Shipping & Payment Information
Shipping Terms
- FOB: Novorossiysk, Russia
- CIF: Available to major ports worldwide
- EXW: Manufacturer's facility, Russia
Delivery Time
- Sea freight: 30-60 days (depending on destination)
- Air freight: 14-21 days (for urgent orders)
- Production lead time: 30-90 days (depending on order size)
Payment Methods
- Letter of Credit (L/C)
- Wire Transfer (T/T)
- Escrow Services
Order Minimums
- We work with orders starting from 1 container
- You can mix different products in one container
- Volume discounts available for larger orders
Customs & Documentation Support
We provide comprehensive assistance with all export documentation, customs clearance, and logistics arrangements. Our team has extensive experience facilitating international trade with businesses in Africa, Middle East, Asia, and Latin America.
Contact Our Import Specialists
WhatsApp (Recommended)
For fastest response and immediate assistance with pricing, availability, and ordering.
+971 58 657 4796For detailed inquiries, documentation requests, and formal communications.
Send Email Inquiry info@tonzar.comRequest Call Back
Schedule a consultation with our import specialists at your convenience.
Business Hours
We're available to assist you during the following hours:
- Monday - Friday: 9:00 AM - 6:00 PM (GMT+4)
- Saturday: 10:00 AM - 2:00 PM (GMT+4)
- Sunday: Closed
Our WhatsApp support is available outside business hours for urgent inquiries.
Similar Products You May Be Interested In

Set of assemblies and parts of steam turbine K-215-130-1M3 for modernisation of CND of unit No.9 "Primorskaya GRES".
View Details
Guiding trowel left 30 stage 47T230-3243
View Details
Coupling PS 200.1411580
View Details
Set of items for technical modernisation of T-100/120-130-2 turbine
View Details
CVD (high pressure cylinder) complete with locking and regulating valves for steam turbine K-830-240-5M of "Sur" project
View Details
Rotor of CND (drawing 48T230-3275SBR)
View Details
Diaphragm clutch PS.100.125.02.000
View Details
Assemblies and parts for modernisation of steam heating turbine T-100 with replacement of high pressure cylinder (HPCC) with inc
View Details
24 stage diaphragm 47T230-3216
View Details
Water vapour turbine part T-50: high pressure cylinder assembly including stop valve and control valves
View Details
Guide ring PS200.1513691
View Details
Rear liner PS.100.314.00.000
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions