High pressure cylinder (HPC) complete with locking and regulating valves for steam turbine PT-80/100-12,8/1,27-2M d

Manufacturer:
Price: Request Quote

Bulk pricing available

FOB, CIF & EXW terms available

Key Highlights

  • Made in Russia - engineered for durability
  • Suitable for challenging environments
  • Lower cost of ownership than European alternatives
  • Bulk orders available with volume discounts
  • Documentation and customs clearance assistance provided

Description

High-pressure cylinder with loop steam flow consists of: cast housings (outer and inner) with horizontal split, with flanging; CVD cages with flanging; one-piece forged high-pressure rotor (HPR). Steam distribution - nozzle, steam supply to the DDC is made through two stop valves and seven control valves. The flow part of the DDC is of reactive type and consists of one regulating and nineteen pressure stages of reactive type. The regulating stage and ten pressure stages located in the inner casing form the left steam flow. The remaining nine pressure stages are located in two cages and form the right flow. The design of the DDC is based on honeycomb overbandage seals.The DDC is equipped with a system of additional heating of thick-walled elements of the casing (flanges of box-less type), for their uniform heating during start-ups, and cooling down during shutdowns.The total weight of the equipment is 240 tonnes.

Specifications

Absolute pressure of fresh steam upstream of stop valves of CVD 23.54 MPa
Temperature of fresh steam upstream of CVD stop valves 540 °C
Absolute vapor pressure behind CVD 4.03 MPa
Steam temperature behind the CVD 286.7 °C
Absolute vapor pressure upstream of DDC stop valves 3.63 MPa
Temperature of steam after superheating before DDC stop valves 540 °C
Cooling water temperature at the condenser inlet B1/B8 2100/900 MHz °C
Absolute pressure in the condenser (reference) 3.6
Volume flow rate of cooling water passing through the condenser 10
Nominal fresh steam flow rate 265.7
Save Your Time

Share your requirements for a quick response!

Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer

Delivery & Payment

Shipping Terms

FOB Novorossiysk, Russia CIF Available to major ports worldwide EXW Manufacturer's facility, Russia

Delivery Time

Sea freight: 30-60 days (depending on destination) Air freight: 14-21 days (for urgent orders)

Payment Methods

Letter of Credit (L/C) Wire Transfer (T/T) Escrow Services

Similar Products You May Be Interested In

Verified Suppliers

All products are sourced directly from authorized Russian manufacturers

Quality Assurance

Products meet international quality standards with proper certification

Global Shipping

Reliable logistics solutions to deliver products to your location

Secure Payments

Multiple secure payment options to facilitate international transactions

Your callback request has been received. We'll contact you shortly.