Available for Import
High-Pressure Cylinder Assembly for PT-135 Turbine - Enhance Performance
Manufacturer:
UTZ OJSC
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Description
Modernisation consists in replacement of units and parts of the PT-135/165-130/15 turbine operating at high temperatures and exhausted resource, and includes the following types of works:
- replacement of the complete CVD with installation on the existing foundation and on the existing housing of the front bearing block and the middle (thrust bearing);
- replacement of DDC control valves and turbine stop valves with preservation of the single-line scheme of fresh steam supply to the stop valves;
- replacement of the cam-type distributor of the VDC control valves;
- replacement of the liners of the front support bearing and rear support bearing of the CVD;
- replacement of oil protection rings.
Designation of the turbine after Modernisation: PT-135/165-12,8/1,47 PR1.
- replacement of the complete CVD with installation on the existing foundation and on the existing housing of the front bearing block and the middle (thrust bearing);
- replacement of DDC control valves and turbine stop valves with preservation of the single-line scheme of fresh steam supply to the stop valves;
- replacement of the cam-type distributor of the VDC control valves;
- replacement of the liners of the front support bearing and rear support bearing of the CVD;
- replacement of oil protection rings.
Designation of the turbine after Modernisation: PT-135/165-12,8/1,47 PR1.
Specifications
Minimum scope of modernization
In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
Average volume of modernization
in addition to replacement of resource units and parts of the high-pressure cylinder, the liners of the front support bearing and the rear support bearing of the high-pressure cylinder and oil protection rings are also replaced
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In
High-Pressure Cylinder for Steam Turbine K-830-240-5M Set with Valves
View DetailsSteam Turbine Diaphragm 30 Stages Model 47T230-3219
View DetailsSteam Turbine Coupling PS 200.1411580
View DetailsRigid Coupling with Fasteners for Steam Turbines PS.100.201.06.000
View DetailsMedium Pressure Cylinder (CSD) with Valve Block SD for K-800-23.5-5MR Steam Turbine
View DetailsDiaphragm 22 Stages 48T230-3276 for Steam Turbine Separation
View DetailsFront Bearing PS.100.313.00.000 - Turbine Support Bearing
View DetailsSteam Turbine Diaphragm for Internal Chamber Separation 48T230-3277
View DetailsTurbine Rotor for KT-65/70-8.8 Artemovsk TPP, Factory No. 33509
View DetailsHigh-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine
View DetailsHigh-Pressure Turbine Cylinder Assembly with Control Valves
View DetailsGuide Ring PS200.1517298
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions