Fountain Valve Manifolds for Oil and Gas Field Development

Fountain Valve Manifolds for Oil and Gas Field Development

US$3,000-60,000
Working pressure: 0...70
nominal passage: 50...500
AK "KORVET" OJSC 🇷🇺
Fountain Equipment Manifold for Oil and Gas Pipelines

Fountain Equipment Manifold for Oil and Gas Pipelines

US$3,000-24,000
Material: carbon steel, stainless steel, corrosion resistant alloy
Material: carbon steel, stainless steel, corrosion resistant alloy
AK "KORVET" OJSC 🇷🇺
Automated PET Keg Assembly Line Model AS-2000

Automated PET Keg Assembly Line Model AS-2000

US$48,000-180,000
Air pressure: 6
Operating voltage: 380
EIDOS-ROBOTICS LLC 🇷🇺
Roller Assembly for Drum 62.384.150.003SB

Roller Assembly for Drum 62.384.150.003SB

US$90-360
Internal diameter: 600
Material grade: 20
EZTM OJSC 🇷🇺
Electromechanical Drive Kit VSP-220K for Crosshead R65 Mark 1/22 with Continuous Rolling Surface

Electromechanical Drive Kit VSP-220K for Crosshead R65 Mark 1/22 with Continuous Rolling Surface

US$300-1,800
Headset type: With external contactor
Type of timber: Reinforced concrete
MSZ OJSC 🇷🇺
Gear Ring with Housing Installation 1340.08.001

Gear Ring with Housing Installation 1340.08.001

US$9,000-30,000
Number of teeth: 400
Length: 11362
URALMASHZAVOD PJSC 🇷🇺
Complete Piston Rod Assembly - Drawing Number 1654A0100-01

Complete Piston Rod Assembly - Drawing Number 1654A0100-01

US$450-1,800
Diameter: 66.62
Length: 442
Hydromash OJSC named after V.I. Luzyanin 🇷🇺
Assembled Pipelines for Hydro-Gas Systems (GOST 13954-74)

Assembled Pipelines for Hydro-Gas Systems (GOST 13954-74)

US$3-60
Diameter: 4...42
Material grade: 12?18?10?, ???2?
AEROTECH LLC 🇷🇺
Printed Circuit Board Assembly Production Equipment

Printed Circuit Board Assembly Production Equipment

US$30,000-180,000
Minimum size of printed circuit board blank: 50×40
Maximum PCB blank size: 460×400
PERMSNABSBYT OJSC 🇷🇺
Brush 3V 027 with Passive Grip

Brush 3V 027 with Passive Grip

US$300-1,200
Maximum finger opening: 95
Weight: 350
PJSC RKK Energia 🇷🇺
3V 011 Passive Grip Frame Brush for Precision Painting

3V 011 Passive Grip Frame Brush for Precision Painting

US$90-360
Weight: 400
Grip force, N: 15
PJSC RKK Energia 🇷🇺

Post your Buy Requirement

Get Quotes from Verified Suppliers

Save Your Time
Complete Rotating Pipe Assembly for Chassis Front Support 091022650

Complete Rotating Pipe Assembly for Chassis Front Support 091022650

US$450-1,800
Length: 199
Width: 90.85
Hydromash OJSC named after V.I. Luzyanin 🇷🇺
Impact-Free Assembly Stand for Ground Equipment - Model: СБС-ГТУ

Impact-Free Assembly Stand for Ground Equipment - Model: СБС-ГТУ

US$9,000-36,000
Lifting capacity of the stand drive mechanism: 3000
Adjustable vertical travelling speed: 0 to 50 mm/minute
RNK Engineering LLC 🇷🇺
Assembled Pipes for Gas and Liquid Transport

Assembled Pipes for Gas and Liquid Transport

US$30-180
Material: 12?18?10?, ???2?
Material: 12?18?10?, ???2?
AEROTECH LLC 🇷🇺
Active Hook-Gripper 5V 017 for Efficient Handling

Active Hook-Gripper 5V 017 for Efficient Handling

US$90-300
Maximum bristle spread: 55
Weight of the load carried: 15
PJSC RKK Energia 🇷🇺
Pandrol Assembly Mechanism for PFK-350 Anchoring System Model VEST.R.239.00.000

Pandrol Assembly Mechanism for PFK-350 Anchoring System Model VEST.R.239.00.000

US$9,000-30,000
Motor power: 4
Length: 2040
PROMRESURS LLC 🇷🇺
Assembly Mechanism ARS for Anchor Rail Fastening ARS 20.VEST.R.238.00.000

Assembly Mechanism ARS for Anchor Rail Fastening ARS 20.VEST.R.238.00.000

US$1,500-4,800
Motor power: 4
Length: 2040
PROMRESURS LLC 🇷🇺
MTМ-1.6 Manual Hoisting Mechanism for Lifting and Moving Loads

MTМ-1.6 Manual Hoisting Mechanism for Lifting and Moving Loads

US$90-300
Type: manual
Type: manual
KUBANTRANSماش LLC 🇷🇺
MTM-3.2 Manual Pulling and Hoisting Mechanism

MTM-3.2 Manual Pulling and Hoisting Mechanism

US$90-300
Length: 687
Maximum tractive force developed by MTM-3,2: 3,2
KUBANTRANSماش LLC 🇷🇺
Manual Lever Winch Mechanism MTM-1.6

Manual Lever Winch Mechanism MTM-1.6

US$150-480
Highest force on the detachable handle: 450
Maximum tractive force developed by the mechanisms: 1,6
Kuban Railway Machinery OJSC 🇷🇺
Collection S-1 - Threaded Connections Standard Compliance

Collection S-1 - Threaded Connections Standard Compliance

US$300-1,800
Threaded connections: according to GOST 24705-2004, GOST 8724-2002 and GOST 16093-2004
Threaded connections: according to GOST 24705-2004, GOST 8724-2002 and GOST 16093-2004
PIGRUPP LLC 🇷🇺
High-Pressure Cylinder Assembly for PT-135 Turbine with Valves

High-Pressure Cylinder Assembly for PT-135 Turbine with Valves

US$30,000-180,000
Minimum scope of modernization: In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
Minimum scope of modernization: In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
UTZ OJSC 🇷🇺
High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves

US$30,000-180,000
Electrical power maximum: 65
Maximum scope of modernization: replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
UTZ OJSC 🇷🇺

3V 011 Brush with Passive Grip for Enhanced Painting Control

US$300-1,800
Maximum finger opening: Flat grinder, Specialised grinder
Weight: 400
PJSC RKK Energia 🇷🇺