High-Pressure Cylinder Assembly for PT-135 Turbine with Valves
US$30,000-180,000
Minimum scope of modernization:
In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
Minimum scope of modernization:
In the modernisation of PT-135 series turbine, the resource units and parts are replaced; operating at the temperature more than 450°C. This allows to renew the resource and improve the technical and economic performance.
UTZ OJSC 🇷🇺
High-Pressure Cylinder Assembly for T-50 Turbine with Stop Valve and Regulating Valves
US$30,000-180,000
Electrical power maximum:
65
Maximum scope of modernization:
replacement of resource assemblies and parts; operating at temperatures greater than 450°c. This allows for renewal of resource; and increases the rated; maximum condensing power and heat load.
UTZ OJSC 🇷🇺