
Gas radiant heating system ICNG-50-L-55 (L-shaped)
Manufacturer:
Price:
Request Quote
Bulk pricing available
FOB, CIF & EXW terms available
Key Highlights
- Made in Russia - engineered for durability
- Suitable for challenging environments
- Lower cost of ownership than European alternatives
- Bulk orders available with volume discounts
- Documentation and customs clearance assistance provided
Description
Hot gas combustion products passing inside the ICNG pipes heat them to a high temperature. The infrared radiator sends long-wave heat rays to surfaces (floor, walls, objects), heating them, and they, in turn, give this heat to the air. As a result, the radiator effectively heats the areas where people are located rather than the entire volume of the room and is an energy-saving system.
In Russian winter conditions, the average payback period is 1.5-2 years. Then GSLO starts to bring profit in the form of solid savings.
The control system performs continuous monitoring and zone heating according to the set temperature modes (working, on-duty, weekend and holiday modes). An enterprise with a single-shift operation mode will save up to 40% of gas per year just by switching the heating system to the on-duty heating mode during non-working hours, weekends and public holidays.
In Russian winter conditions, the average payback period is 1.5-2 years. Then GSLO starts to bring profit in the form of solid savings.
The control system performs continuous monitoring and zone heating according to the set temperature modes (working, on-duty, weekend and holiday modes). An enterprise with a single-shift operation mode will save up to 40% of gas per year just by switching the heating system to the on-duty heating mode during non-working hours, weekends and public holidays.
Specifications
Power
55 kW
Gas consumption
5.56
Length
18600 mm
Width
400 mm
Height
315 mm
Weight
118 kg
Share your requirements for a quick response!
Instant response in 15 minutes
Best wholesale prices guaranteed
Direct from manufacturer
Delivery & Payment
Shipping Terms
Delivery Time
Sea freight: 30-60 days (depending on destination)
Air freight: 14-21 days (for urgent orders)
Payment Methods
Similar Products You May Be Interested In

Propeller steering column AT1220
View Details
Inertial and manually driven hose reels
View Details
Tank of constant steam purging SVD black.D1117-E.00.00.000 TU 3600-013-00220575-2002
View Details
Nitrogen receiver RA75-3,0-UHL1 with service platform black RA75-3,0-UHL1-PO.00.000 TU 3600-013-00220575-2002
View Details
Cable tray vertical swivelling for cable trays type 2 (PV-LKN)
View Details
Switching device switch box KRAB
View Details
Capacity at the suction of 2 st. compressor of propane refrigerant D1502-E.00.00.000 TU 3600-013-00220575-2002
View Details
Condensate collector for E-1309 black.D1309-E.00.00.000 TU 3600-013-00220575-2002
View Details
Splitstone MCS-613 Multi-Disc Joint Cutter
View Details
Filter-separator unit of high pressure compressor gas PN250 black.FS3-003862.00.00.000
View Details
Bayonet gates
View Details
Long-acting comparison electrode TU 3435-016-93719333-2013, type ES-TST-STELS-R40-Cu
View DetailsVerified Suppliers
All products are sourced directly from authorized Russian manufacturers
Quality Assurance
Products meet international quality standards with proper certification
Global Shipping
Reliable logistics solutions to deliver products to your location
Secure Payments
Multiple secure payment options to facilitate international transactions