سایر
کمد رختکن و لاکر
صندلی سالن همایش
کابینت پستی و یاخهای
پیشخوان و قفسه اتاق انتظار
نیمکت اتاق انتظار
کابینت روزنامه و مجله
مبل اتاق انتظار
صندلی ردیفی و تاشو
پایه و حصار راهنما
قفسه کتابخانه
جالباسی ایستاده و دیواری
ویترین و سکوی نمایشگاهی
استند اطلاعات
کیوسک رایگیری و صندوق
صندلی ورزشی، رینگ و تاتامی
تریبون و سکوی سخنرانی
بارر باله
محصولات — مبلمان فضاهای عمومی
Public Seating Chair "Prague" 530*740*960 mm, Cushion Thickness 75 mm
﷼ 1,764,000-7,560,000
LIMAR LLC 🇷🇺
Heavy-Duty Locker for Changing Rooms PRAKTIK ML 11-30 (Base Module)
﷼ 1,512,000-4,032,000
NPOMET LLC 🇷🇺
Interactive Speaker Podium "Swan" from the "Kiselkovoe Kingdom" Series
﷼ 37,800,000-151,200,000
BAZA LLC 🇷🇺
High Stand with Cutout for Cables 8516, "Waiting Zone Galant" Series
﷼ 3,780,000-12,600,000
MEBEL COMFORT LLC 🇷🇺
Public Space Armchair Asia-Kino, Size: 540*720*1000 mm, Cushion Thickness 140 mm
﷼ 3,780,000-12,600,000
BLOCK OJSC 🇷🇺
Formula Transformer Armchair, 540*700*1000 mm, Seat Cushion Thickness 140 mm
﷼ 3,780,000-12,600,000
BLOCK OJSC 🇷🇺
Comfortable Armchair "Komfort-Hall" 580*680*1050 mm, 140 mm Seat Cushion
﷼ 3,780,000-12,600,000
BLOCK OJSC 🇷🇺
Demonstration Desk B1 900x4000x500-1200x650-1250mm
﷼ 8,820,000-35,280,000
KOMOD Furniture Factory LLC 🇷🇺
FAQ
•Can the manufacturer design the seating layout from our hall drawings?
Yes, layout design is part of the standard offer. You provide the architectural plan with stage position and floor steps, and the factory calculates rows, spacing, aisle compliance and seat counts, then manufactures to that scheme. Expect a drawing exchange of one or two iterations before production starts.
•Is the upholstery fire-rated for public venues?
Auditorium lines are produced with upholstery and foams intended for public-assembly requirements, and suppliers provide fire-behaviour certificates with the shipment. Regulations differ by country, so state your national standard in the inquiry and the factory will confirm which certificate set applies or test accordingly.
•How is a 500-seat auditorium order shipped and installed?
Seats ship partially disassembled, stands, seats and backs in labelled batches by row, typically filling one or two 40 ft containers for a 500-seat hall. Installation is by your local contractor following factory drawings; many manufacturers offer a supervising engineer for the first days by separate agreement.
•What is the typical production time for venue projects?
After layout approval, manufacturing of a mid-sized hall usually takes 45-60 days depending on upholstery choice and mechanism type. Adding sea freight, a realistic door-to-door horizon for the Gulf or North Africa is three to four months, so seating is ordered alongside interior finishing works.
•Do lockers and changing cabinets come with different locking options?
Yes, key locks are standard, with coin-return, padlock hasp, code and RFID options available across most locker series for pools, stadiums and workplaces. Ventilation perforation, sloped tops and bench-base combinations are catalogue variants; specify the operating environment and the factory proposes the right configuration.