Educational Equipment Set for Electrical Engineering and Basics of Electronics

Educational Equipment Set for Electrical Engineering and Basics of Electronics

US$1,500-6,000
Length: 1980
Width: 650
LABSIS LLC 🇷🇺
Industrial Sensors Educational Equipment Kit

Industrial Sensors Educational Equipment Kit

US$1,500-4,800
Height: 1550
Width: 650
LABSIS LLC 🇷🇺
CNC Vertical Honing Machine CC740B2 for High-Precision Applications

CNC Vertical Honing Machine CC740B2 for High-Precision Applications

US$42,000-150,000
Limit diameters of machined holes: 85...95
Spindle head stroke: 10...600
Stankoстроение LLC 🇷🇺
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade

US$90,000-600,000
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine

High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine

US$90,000-600,000
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization: modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Industrial Equipment Training Kit for Technical Studies AD03060106

Industrial Equipment Training Kit for Technical Studies AD03060106

US$300-18,000
Weight: 1...3000
Height: 10...3000
BLOCK OJSC 🇷🇺
Fire Safety and Rescue Operations Equipment Complex

Fire Safety and Rescue Operations Equipment Complex

US$300-18,000
Number of elements: 1...30
Warranty period: 12 months
BK-STUDIO LLC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

Single-Shaft Steam Turbine K-85-8.0 for Industrial Use

US$90,000-300,000
Rated/maximum power: 88.4
Fresh steam pressure: 7.64
UTZ OJSC 🇷🇺
Steam Turbine R-50-12.8/1.5 for Power Generation

Steam Turbine R-50-12.8/1.5 for Power Generation

US$90,000-300,000
Assignment: for electricity and steam generation
Assignment: for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications

Steam Turbine T-120/130-12.8-NG for Industrial Applications

US$1,500,000-4,800,000
Rated power: 120
Steam consumption: 540
UTZ OJSC 🇷🇺

Steam Turbine P-12-3.4/0.5 - High Efficiency Power Generation

US$90,000-600,000
Power: 1340...34000
Absolute pressure of fresh steam: 1.85...9.3
PJSC KALUGA TURBINE PLANT 🇷🇺