Steam Turbine
Training Equipment Set
Stator sections kit
Turbine Diaphragm
Anode Grounding
Wellhead Assembly
Turbine upgrade kit
Carbon Electrodes
Graphite Electrodes
Honing Machine
Linear Carriage
Modular Vise
PET bottle blowing machine
Polishing Machine
Roller Carriage
Shot Blasting Machine
Spot Welder Machine
Die Casting Machine
Welded Steel Vessel
Educational Equipment Set for Electrical Engineering and Basics of Electronics
US$1,500-6,000
Length:
1980
Width:
650
LABSIS LLC 🇷🇺
CNC Vertical Honing Machine CC740B2 for High-Precision Applications
US$42,000-150,000
Limit diameters of machined holes:
85...95
Spindle head stroke:
10...600
Stankoстроение LLC 🇷🇺
High-Pressure Turbine Cylinder Assembly for T-100-130 Upgrade
US$90,000-600,000
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of t-100 series turbine replace resource nodes and parts; operating at temperature more than 450°c. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
High-Pressure Cylinder Upgrade Kit for PT-60 Steam Turbine
US$90,000-600,000
Minimum scope of modernization:
modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
Minimum scope of modernization:
modernisation of turbine of series T-60 replace resource units and parts; operating at temperature more than 450°?. it allows to renew resource; and also to increase nominal; maximum power and heat load in condensing mode.
UTZ OJSC 🇷🇺
Industrial Equipment Training Kit for Technical Studies AD03060106
US$300-18,000
Weight:
1...3000
Height:
10...3000
BLOCK OJSC 🇷🇺
Fire Safety and Rescue Operations Equipment Complex
US$300-18,000
Number of elements:
1...30
Warranty period:
12 months
BK-STUDIO LLC 🇷🇺
Single-Shaft Steam Turbine K-85-8.0 for Industrial Use
US$90,000-300,000
Rated/maximum power:
88.4
Fresh steam pressure:
7.64
UTZ OJSC 🇷🇺
Steam Turbine R-50-12.8/1.5 for Power Generation
US$90,000-300,000
Assignment:
for electricity and steam generation
Assignment:
for electricity and steam generation
UTZ OJSC 🇷🇺
Steam Turbine T-120/130-12.8-NG for Industrial Applications
US$1,500,000-4,800,000
Rated power:
120
Steam consumption:
540
UTZ OJSC 🇷🇺
Steam Turbine P-12-3.4/0.5 - High Efficiency Power Generation
US$90,000-600,000
Power:
1340...34000
Absolute pressure of fresh steam:
1.85...9.3
PJSC KALUGA TURBINE PLANT 🇷🇺